Would you like to inspect the original subtitles? These are the user uploaded subtitles that are being translated:
1
00:00:53,275 --> 00:00:56,206
Narrator: CERAMIC IS ONE
OF THE BEST INSULATION MATERIALS
2
00:00:56,206 --> 00:00:58,379
IN THE WORLD.
3
00:00:58,379 --> 00:01:02,068
GRILLS MADE WITH CERAMIC BODIES
CAN BAKE, ROAST, SMOKE,
4
00:01:02,068 --> 00:01:04,103
AND, OF COURSE, GRILL FOOD.
5
00:01:04,103 --> 00:01:06,965
CERAMIC GRILLS RETAIN MORE HEAT
THAN METAL ONES,
6
00:01:06,965 --> 00:01:10,620
RESULTING IN A JUICIER,
MORE FLAVORFUL MEAL.
7
00:01:14,379 --> 00:01:17,448
CERAMIC GRILLS
USE NATURAL-LUMP CHARCOAL.
8
00:01:17,448 --> 00:01:20,172
NATURAL CHARCOAL IS MADE
BY CARBONIZING WOOD
9
00:01:20,172 --> 00:01:23,758
THROUGH A SPECIALIZED
HEATING PROCESS.
10
00:01:23,758 --> 00:01:25,344
COOKING WITH NATURAL CHARCOAL
11
00:01:25,344 --> 00:01:28,241
IS JUST LIKE COOKING
OVER A CAMPFIRE.
12
00:01:30,724 --> 00:01:33,586
AT THIS FACTORY,
THEY BEGIN BY MAKING A SLURRY.
13
00:01:33,586 --> 00:01:37,379
THE MAIN INGREDIENTS
ARE WATER, CLAY, FELDSPAR,
14
00:01:37,379 --> 00:01:40,379
AND OTHER RAW MATERIALS.
15
00:01:40,379 --> 00:01:42,758
WHEN THE SLURRY IS FIRED
AT A HIGH TEMPERATURE,
16
00:01:42,758 --> 00:01:45,034
IT HARDENS
INTO CERAMIC MATERIAL.
17
00:01:50,689 --> 00:01:53,620
ANOTHER TEAM ASSEMBLES
THE TWO-PART PLASTER MOLD
18
00:01:53,620 --> 00:01:57,068
TO CAST THE BASE OF THE GRILL.
19
00:01:57,068 --> 00:02:00,068
AFTER CLEANING OFF RESIDUE
FROM THE PREVIOUS CASTING,
20
00:02:00,068 --> 00:02:04,034
THEY CLAMP THE PARTS TOGETHER.
21
00:02:04,034 --> 00:02:06,034
THE MOLD HAS TWO FUNNELS.
22
00:02:06,034 --> 00:02:09,482
ONE FUNNEL PUMPS
THE SLURRY INTO THE MOLD.
23
00:02:09,482 --> 00:02:13,000
THE OTHER ALLOWS AIR TO EXIT
AS THE SLURRY FILLS THE GAP
24
00:02:13,000 --> 00:02:15,448
BETWEEN THE TWO PARTS
OF THE MOLD.
25
00:02:18,310 --> 00:02:21,000
THEY LET THE SLURRY SET
FOR SEVERAL HOURS.
26
00:02:21,000 --> 00:02:23,896
THE PLASTER MOLD ABSORBS 80%
OF THE WATER,
27
00:02:23,896 --> 00:02:28,448
LEAVING A FIRM BUT DAMP CASTING.
28
00:02:28,448 --> 00:02:30,241
THEY REMOVE THE TOP PART
OF THE MOLD
29
00:02:30,241 --> 00:02:33,103
AND TRIM OFF
ANY EXCESS MATERIAL.
30
00:02:35,000 --> 00:02:39,551
THEY CUT OUT A RECTANGULAR HULL
FOR THE SLIDING DRAFT DOOR.
31
00:02:39,551 --> 00:02:43,275
THE DOOR ALLOWS COLD AIR
TO ENTER THE GRILL.
32
00:02:43,275 --> 00:02:46,620
THEN A WORKER USES A VACUUM
ATTACHED TO A HOIST
33
00:02:46,620 --> 00:02:51,241
TO REMOVE THE HEAVY GRILL BASE
FROM THE MOLD.
34
00:02:51,241 --> 00:02:53,137
THEY REPEAT THIS CASTING PROCESS
35
00:02:53,137 --> 00:02:55,310
FOR THE OTHER CERAMIC PARTS
OF THE GRILL,
36
00:02:55,310 --> 00:02:58,448
INCLUDING THE TOP CALLED
THE DOME AND THE FIRE BOX,
37
00:02:58,448 --> 00:03:01,896
WHICH SITS INSIDE THE BASE
AND HOLDS THE CHARCOAL.
38
00:03:05,413 --> 00:03:06,793
AFTER EACH CASTING,
39
00:03:06,793 --> 00:03:10,517
THEY SCRAPE AND SAND
AWAY THE EXCESS MATERIAL.
40
00:03:16,482 --> 00:03:18,862
THEY ROLL THE CAST PARTS
INTO A DRYER
41
00:03:18,862 --> 00:03:21,413
TO REMOVE
THE REMAINING MOISTURE.
42
00:03:21,413 --> 00:03:23,068
FOR THE NEXT 30 HOURS,
43
00:03:23,068 --> 00:03:24,482
BLOWERS CIRCULATE AIR
44
00:03:24,482 --> 00:03:28,448
THAT'S HEATED TO
180 DEGREES FAHRENHEIT.
45
00:03:28,448 --> 00:03:30,931
AFTER THE PARTS COOL,
THE BASE AND DOME
46
00:03:30,931 --> 00:03:34,965
UNDERGO A FINAL TOUCH UP TO
PERFECT THEIR EXTERIOR SURFACES.
47
00:03:37,310 --> 00:03:41,103
NEXT, THE PARTS ARE TAKEN
TO AN AUTOMATED GLAZING STATION.
48
00:03:41,103 --> 00:03:45,862
A CONVEYOR SPINS THE PARTS
UNDER A SHOWER OF CERAMIC GLAZE.
49
00:03:45,862 --> 00:03:47,586
A WORKER CHECKS THE COVERAGE
50
00:03:47,586 --> 00:03:50,758
AND SPRAYS A TOUCH UP
WHERE REQUIRED.
51
00:03:52,793 --> 00:03:56,413
THE GLAZE DRIES
IN ABOUT 20 SECONDS.
52
00:03:58,241 --> 00:04:01,206
WORKERS VACUUM UP THE EXCESS...
53
00:04:04,344 --> 00:04:08,758
...THEN TEMPORARILY ASSEMBLE
THE GRILL FOR FIRING.
54
00:04:08,758 --> 00:04:13,172
THEY PLACE THE FIRE BOX
INSIDE THE BASE,
55
00:04:13,172 --> 00:04:18,310
THE BASE PLATE
AT THE BOTTOM OF THE FIRE BOX,
56
00:04:18,310 --> 00:04:21,344
AND THE DOME ON TOP OF THE BASE.
57
00:04:21,344 --> 00:04:25,724
THEY FIRE THE GRILLS
IN A HUGE KILN FOR 24 HOURS.
58
00:04:25,724 --> 00:04:27,551
THEY GRADUALLY INCREASE
THE TEMPERATURE
59
00:04:27,551 --> 00:04:30,862
TO MORE THAN
2,300 DEGREES FAHRENHEIT,
60
00:04:30,862 --> 00:04:34,862
HOLD IT THERE FOR A SET TIME,
THEN GRADUALLY COOL IT DOWN.
61
00:04:34,862 --> 00:04:37,827
THIS FIRING PROCESS
TRIGGERS A CHEMICAL REACTION
62
00:04:37,827 --> 00:04:40,275
THAT TRANSFORMS
THE CLAY-BASED SLURRY
63
00:04:40,275 --> 00:04:44,000
INTO HARD, HEAT-RESISTANT
CERAMIC.
64
00:04:44,000 --> 00:04:49,310
IT ALSO TURNS THE GLAZE
ON THE SURFACE INTO BLACK GLASS.
65
00:04:49,310 --> 00:04:50,724
AFTER FIRING,
66
00:04:50,724 --> 00:04:54,655
THEY ATTACH THE STAINLESS STEEL
DRAFT DOOR TO THE BASE.
67
00:04:54,655 --> 00:04:58,034
THEY SPREAD ADHESIVE
ON THE TOP EDGE OF THE BASE...
68
00:05:00,413 --> 00:05:05,206
...AND APPLY A GASKET
MADE OF HEAT-RESISTANT MATERIAL.
69
00:05:05,206 --> 00:05:08,896
THIS CREATES AN AIR SEAL
BETWEEN THE BASE AND THE DOME.
70
00:05:08,896 --> 00:05:12,413
THEN THEY ATTACH THE TWO PARTS
WITH A HINGE.
71
00:05:16,655 --> 00:05:20,275
THEY INSERT THE FIRE BOX
AND STAMP IT.
72
00:05:23,620 --> 00:05:26,137
THEN THEY GLUE A GASKET
AROUND THE NECK OF THE DOME
73
00:05:26,137 --> 00:05:29,137
AND INSTALL THE TOP VENT.
74
00:05:29,137 --> 00:05:32,241
THEY PLACE THE CAST-IRON GRATE
THAT HOLDS THE CHARCOAL
75
00:05:32,241 --> 00:05:35,206
AND THE PORCELAIN-COATED COOKING
GRATES INSIDE THE GRILL.
76
00:05:35,206 --> 00:05:37,862
THE CAST-IRON GRATE
HOLDS THE CHARCOAL.
77
00:05:37,862 --> 00:05:40,379
THE PORCELAIN-COATED GRATE
IS FOR COOKING.
78
00:05:40,379 --> 00:05:43,931
FINALLY,
THEY INSTALL THE THERMOMETER.
79
00:05:43,931 --> 00:05:45,620
AFTER LIGHTING THE CHARCOAL,
80
00:05:45,620 --> 00:05:48,206
GRILLERS CAN ADJUST THE AIR FLOW
WITH THE DRAFT DOOR
81
00:05:48,206 --> 00:05:50,206
AND TOP VENT.
82
00:05:50,206 --> 00:05:51,758
THE DRAFT DOOR AND TOP VENT
83
00:05:51,758 --> 00:05:54,482
MUST BE FULLY CLOSED
TO SHUT OFF THE GRILL.
84
00:05:54,482 --> 00:05:58,068
THIS CUTS OFF THE AIR SUPPLY
AND EXTINGUISHES THE FIRE.
85
00:06:07,137 --> 00:06:08,448
Narrator: MANY FACTORIES
86
00:06:08,448 --> 00:06:13,275
USE PUNCHING MACHINES
TO MAKE THE PARTS THEY NEED.
87
00:06:13,275 --> 00:06:16,862
OLDER PUNCHING MACHINES
CONSISTED OF A LARGE PRESS
88
00:06:16,862 --> 00:06:20,482
POWERED BY A SEPARATE HYDRAULIC
OR PNEUMATIC SYSTEM.
89
00:06:20,482 --> 00:06:22,137
TODAY'S SMALLER
PUNCHING MACHINES
90
00:06:22,137 --> 00:06:26,034
CONTAIN BOTH OF THESE COMPONENTS
IN A SINGLE DEVICE.
91
00:06:28,379 --> 00:06:30,655
THESE PUNCHING MACHINES
ARE USED IN FACTORIES
92
00:06:30,655 --> 00:06:33,827
THAT MAKE ALUMINUM WINDOW
AND DOOR FRAMES.
93
00:06:35,931 --> 00:06:37,379
A FACTORY WORKER INSERTS
94
00:06:37,379 --> 00:06:39,724
A STRIP OF EXTRUDED ALUMINUM
IN THE MACHINE
95
00:06:39,724 --> 00:06:43,000
AND PRESSES A FOOT PEDAL.
96
00:06:43,000 --> 00:06:46,586
THE PUNCH STRIKES THE DIE,
MAKING THE REQUIRED CUT.
97
00:06:49,068 --> 00:06:51,862
THEY CONSTRUCT THE MACHINE
OUT OF STEEL AND ALUMINUM,
98
00:06:51,862 --> 00:06:55,586
BOTH OF WHICH ARRIVE
AT THE FACTORY AS SOLID BARS.
99
00:06:57,931 --> 00:07:00,896
FIRST THEY SAW THE BARS
INTO SMALLER PIECES
100
00:07:00,896 --> 00:07:04,551
SO THEY CAN MAKE THE MACHINE'S
VARIOUS COMPONENTS.
101
00:07:14,068 --> 00:07:15,758
THEY PLACE THE ALUMINUM PIECES
102
00:07:15,758 --> 00:07:18,620
IN A COMPUTER-GUIDED
MILLING MACHINE.
103
00:07:21,068 --> 00:07:23,931
IT USES A SERIES OF TOOLS
TO SHAPE THE METAL
104
00:07:23,931 --> 00:07:26,103
INTO A SPECIFIC COMPONENT.
105
00:07:32,068 --> 00:07:35,310
THIS PIECE IS CALLED
A PUNCH GUIDE.
106
00:07:35,310 --> 00:07:37,310
ITS JOB IS TO ALIGN
THE PUNCH TOOL
107
00:07:37,310 --> 00:07:40,172
SO THAT IT STRIKES THE DIE
CORRECTLY.
108
00:07:42,275 --> 00:07:44,310
A WORKER GRINDS THE EDGES
OF THE PART
109
00:07:44,310 --> 00:07:46,448
UNTIL THEY'RE SMOOTH.
110
00:07:57,896 --> 00:08:00,655
A DIFFERENT MILLING MACHINE
CUTS MORE RESILIENT PARTS
111
00:08:00,655 --> 00:08:02,310
OUT OF STEEL BARS.
112
00:08:02,310 --> 00:08:04,068
IT, TOO, IS COMPUTER GUIDED
113
00:08:04,068 --> 00:08:06,862
AND FOLLOWS
TECHNICAL SPECIFICATIONS.
114
00:08:13,586 --> 00:08:16,448
THIS STEEL COMPONENT
IS THE PUNCH TOOL.
115
00:08:19,793 --> 00:08:23,758
IT STRIKES THROUGH A STEEL DIE
MANUFACTURED THE SAME WAY.
116
00:08:27,413 --> 00:08:28,724
EVERY MACHINE PART
117
00:08:28,724 --> 00:08:31,310
UNDERGOES A METICULOUS
QUALITY-CONTROL INSPECTION.
118
00:08:31,310 --> 00:08:36,620
THIS COMPUTER-GUIDED SENSOR
CHECKS EACH PIECE.
119
00:08:36,620 --> 00:08:38,655
ONCE ALL THE PARTS
HAVE PASSED TESTING,
120
00:08:38,655 --> 00:08:40,620
WORKERS BEGIN ASSEMBLING.
121
00:08:40,620 --> 00:08:43,241
THE MACHINE'S BASE HOUSES
THE AIR CYLINDER.
122
00:08:43,241 --> 00:08:45,482
THEY POSITION THE DIE
ON TOP OF THE BASE
123
00:08:45,482 --> 00:08:49,000
AND SCREW IT IN PLACE.
124
00:08:49,000 --> 00:08:50,758
THEN THEY INSTALL THE PUNCH,
125
00:08:50,758 --> 00:08:54,206
CAREFULLY CENTERING IT
OVER THE DIE.
126
00:08:54,206 --> 00:08:58,310
A WORKER HOOKS UP HOSES
TO THE AIR CYLINDER.
127
00:08:58,310 --> 00:08:59,655
HE TESTS EVERYTHING
128
00:08:59,655 --> 00:09:02,034
TO MAKE SURE IT'S PROPERLY
ALIGNED WITH THE DIE,
129
00:09:02,034 --> 00:09:04,275
THEN HE FASTENS IT WITH SCREWS.
130
00:09:04,275 --> 00:09:07,103
THEY INSTALL THE FLOOR
OF THE MACHINE'S SECOND LEVEL.
131
00:09:07,103 --> 00:09:09,448
A MACHINE CAN HOLD UP
TO THREE DIFFERENT DIES
132
00:09:09,448 --> 00:09:12,068
ON THREE SEPARATE LEVELS.
133
00:09:12,068 --> 00:09:15,655
THEY POSITION THE SECOND DIE
ON THE GUIDE PINS,
134
00:09:18,068 --> 00:09:22,068
THEN INSTALL THE CEILING
OF THE SECOND LEVEL.
135
00:09:22,068 --> 00:09:24,827
THEY GLUE THE PUNCHES
TO THE CEILING.
136
00:09:31,034 --> 00:09:32,931
THIS LEVEL HAS SEVERAL PUNCHES,
137
00:09:32,931 --> 00:09:34,965
ALLOWING THE MACHINE
TO MAKE DIFFERENT CUTS
138
00:09:34,965 --> 00:09:36,689
USING THE SAME DIE.
139
00:09:36,689 --> 00:09:39,827
THE CUTS CAN BE SIMULTANEOUS
OR CONTINUOUS.
140
00:09:47,965 --> 00:09:49,551
THEY INSTALL A PUNCH SELECTOR
141
00:09:49,551 --> 00:09:54,241
WHICH ALLOWS USERS TO ACTIVATE
OR DEACTIVATE EACH PUNCH.
142
00:09:58,172 --> 00:10:00,137
ONCE INSTALLATION IS COMPLETE,
143
00:10:00,137 --> 00:10:03,344
THEY TEST THE ALIGNMENT
OF THE PUNCHES.
144
00:10:05,206 --> 00:10:07,862
THEN THEY MOUNT SAFETY COVERS
ON THE MACHINE.
145
00:10:07,862 --> 00:10:09,448
THEY PREVENT WORKERS' HANDS
146
00:10:09,448 --> 00:10:14,137
FROM ACCIDENTALLY GETTING CAUGHT
BETWEEN A PUNCH AND DIE.
147
00:10:14,137 --> 00:10:18,068
NEXT, THEY MAKE THE PNEUMATIC
SYSTEM THAT POWERS THE MACHINE.
148
00:10:18,068 --> 00:10:21,206
FIRST, THEY ATTACH AIR HOSES
TO THE FOOT PEDAL.
149
00:10:21,206 --> 00:10:23,344
THE OPERATOR WILL STEP ON
THE PEDAL
150
00:10:23,344 --> 00:10:24,689
TO PUNCH OUT THE METAL.
151
00:10:24,689 --> 00:10:26,793
THEN THEY HOOK UP THE OTHER END
OF THE HOSES
152
00:10:26,793 --> 00:10:30,034
TO THE COMPRESSED AIR-SUPPLY
LINE.
153
00:10:30,034 --> 00:10:32,241
NOW THE PNEUMATIC
PUNCHING MACHINE
154
00:10:32,241 --> 00:10:36,965
IS READY TO BE USED
AT THE WINDOW-AND-DOOR FACTORY.
155
00:10:36,965 --> 00:10:39,551
A WORKER INSERTS A STRIP
OF EXTRUDED ALUMINUM
156
00:10:39,551 --> 00:10:43,000
INTO THE FIRST DIE
TO NOTCH THE END,
157
00:10:43,000 --> 00:10:44,344
THEN INTO THE SECOND DIE
158
00:10:44,344 --> 00:10:49,862
TO PUNCH THREE HOLES
TO JOIN THE WINDOW-FRAME PARTS.
159
00:10:49,862 --> 00:10:52,482
FINALLY, THE THIRD DIE
PUNCHES THREE SCREW HOLES
160
00:10:52,482 --> 00:10:54,344
ON THE OPPOSITE SIDE.
161
00:10:58,034 --> 00:10:59,379
THE MACHINE SAVES TIME
162
00:10:59,379 --> 00:11:03,068
BECAUSE THEY DON'T HAVE
TO SWITCH DIES BETWEEN EACH CUT.
163
00:11:19,862 --> 00:11:23,931
Narrator: WATER IS ESSENTIAL
TO LIFE ON EARTH.
164
00:11:23,931 --> 00:11:25,413
WE NEED IT TO SURVIVE,
165
00:11:25,413 --> 00:11:27,896
BUT WE ALSO USE IT
FOR ENTERTAINMENT.
166
00:11:27,896 --> 00:11:30,137
WATER-JET FOUNTAINS
CAPTIVATE AUDIENCES
167
00:11:30,137 --> 00:11:32,068
WITH INCREDIBLE DISPLAYS.
168
00:11:32,068 --> 00:11:34,448
SOME EVEN USE LIGHTS
TO CHANGE THE APPEARANCE
169
00:11:34,448 --> 00:11:36,517
OF THE WATER'S COLOR.
170
00:11:41,793 --> 00:11:44,758
THESE WATER-JET FOUNTAINS
SEND SPIRALING RIBBONS OF COLOR
171
00:11:44,758 --> 00:11:45,793
INTO THE AIR.
172
00:11:45,793 --> 00:11:48,068
THE EFFECT IS MAGICAL.
173
00:11:49,896 --> 00:11:53,379
PRODUCTION STARTS
WITH THIS CAST-BRONZE PART.
174
00:11:53,379 --> 00:11:54,896
COMPUTERIZED TOOLS
175
00:11:54,896 --> 00:12:00,103
TRANSFORM IT IT INTO A FLANGE
THAT WILL BE INSTALLED ON-SITE.
176
00:12:00,103 --> 00:12:02,862
THE FLANGE IS DESIGNED
TO PREVENT LEAKS WHERE THE PIPE
177
00:12:02,862 --> 00:12:05,862
MEETS THE CONCRETE POOL.
178
00:12:05,862 --> 00:12:08,172
THE NEXT PART
IS A STAINLESS-STEEL FACEPLATE
179
00:12:08,172 --> 00:12:09,379
FOR THE FOUNTAIN.
180
00:12:09,379 --> 00:12:11,724
AN EMPLOYEE PLACES IT
ON A TEMPLATE,
181
00:12:11,724 --> 00:12:16,724
CLOSES A U.V.-LIGHT SHIELD,
AND ACTIVATES A LASER.
182
00:12:16,724 --> 00:12:18,793
THE LASER ETCHES
PRODUCT INFORMATION
183
00:12:18,793 --> 00:12:20,689
INTO THE STEEL.
184
00:12:20,689 --> 00:12:25,896
THIS BRANDING IS PERMANENT
AND WON'T WEAR OFF.
185
00:12:25,896 --> 00:12:29,241
NEXT, A TECHNICIAN ASSEMBLES
THE COLORED L.E.D. LIGHTS.
186
00:12:29,241 --> 00:12:31,689
HE CONNECTS THE CIRCUITRY
TO A CABLE,
187
00:12:31,689 --> 00:12:35,137
THEN SLIDES THE BULB AND ITS
HOUSING ON TO THE CIRCUITRY.
188
00:12:35,137 --> 00:12:37,379
HE SCREWS A METAL RING
ON TO THE BASE
189
00:12:37,379 --> 00:12:39,551
TO KEEP THE LIGHT WATERTIGHT.
190
00:12:42,689 --> 00:12:44,931
HE IMMERSES THE LIGHT
IN A CLEAR WATER TANK
191
00:12:44,931 --> 00:12:47,965
TO TEST IT.
192
00:12:47,965 --> 00:12:51,034
HE SWITCHES ON A VACUUM
TO SUCK AIR OUT OF THE TANK,
193
00:12:51,034 --> 00:12:54,206
SIMULATING UNDERWATER PRESSURE.
194
00:12:55,620 --> 00:12:57,586
HE CHECKS FOR BUBBLES
AROUND THE LIGHT,
195
00:12:57,586 --> 00:12:59,655
WHICH WOULD INDICATE A LEAK.
196
00:13:06,206 --> 00:13:07,620
HE PROGRAMS THE LIGHT
197
00:13:07,620 --> 00:13:11,862
FOR THE WATER SHOW SO THAT
DIFFERENT COLORS FLASH ON CUE.
198
00:13:14,034 --> 00:13:17,655
THE NEXT EMPLOYEE
PREPARES AN EPOXY SEALANT.
199
00:13:17,655 --> 00:13:19,103
HE POURS THE EPOXY
200
00:13:19,103 --> 00:13:22,482
INTO THE SOLENOID CONTROLLER
FOR THE WATER-FOUNTAIN JETS.
201
00:13:25,068 --> 00:13:28,896
IT TAKES TWO HOURS TO DRY.
202
00:13:28,896 --> 00:13:30,206
ONCE SOLIDIFIED,
203
00:13:30,206 --> 00:13:33,551
IT WILL PROTECT THE COMPONENTS
FROM WATER DAMAGE.
204
00:13:33,551 --> 00:13:36,896
THEN HE ASSEMBLES THE CARRIAGE
FOR THE FOUNTAIN JETS.
205
00:13:38,482 --> 00:13:41,241
HE PLACES THE CARRIAGE
ON A SPRING-LOADED SLIDE
206
00:13:41,241 --> 00:13:45,896
AND SECURES
IT WITH LONG-THREADED RODS.
207
00:13:45,896 --> 00:13:48,448
THE WORKER APPLIES SEALANT
TO THE ENDS OF THE RODS
208
00:13:48,448 --> 00:13:51,793
AND SCREWS ON THE NUTS.
209
00:13:51,793 --> 00:13:54,206
HE INSTALLS A PLASTIC
NOZZLE CUP.
210
00:13:54,206 --> 00:13:55,758
HE SECURES IT TO THE CARRIAGE
211
00:13:55,758 --> 00:13:59,000
WITH A CENTER PIN
THAT HAS A SWIVELING MECHANISM.
212
00:14:04,758 --> 00:14:06,586
HE TRANSFERS
THE CARRIAGE ASSEMBLY
213
00:14:06,586 --> 00:14:11,551
TO A WATER-DISTRIBUTION MANIFOLD
214
00:14:11,551 --> 00:14:14,103
AND SCREWS IT IN PLACE.
215
00:14:20,206 --> 00:14:21,517
HE TESTS THE CARRIAGE
216
00:14:21,517 --> 00:14:25,103
AND CONFIRMS THAT IT
SLIDES FREELY ON THE SPRINGS.
217
00:14:30,000 --> 00:14:31,655
THEN HE RUNS PLASTIC TUBING
218
00:14:31,655 --> 00:14:33,965
FROM THE WATER-DISTRIBUTION
MANIFOLD
219
00:14:33,965 --> 00:14:36,310
TO THE SPOUTS
OF THE NOZZLE CUPS.
220
00:14:40,862 --> 00:14:44,827
THE WORKER SECURES THE JOINTS
WITH PLASTIC ZIP TIES.
221
00:14:49,965 --> 00:14:53,448
THEN HE TRIMS THE TIES
USING A SPECIAL GUN.
222
00:14:54,896 --> 00:15:00,793
HE ATTACHES THE SOLENOID
CONTROLLER TO THE CARRIAGE
223
00:15:00,793 --> 00:15:03,655
AND CONNECTS THE CONTROLLER
TO THE VARIOUS AIR TUBES
224
00:15:03,655 --> 00:15:05,827
THAT LEAD TO THE WATERSPOUTS.
225
00:15:10,034 --> 00:15:11,827
HE PLACES THE WATER-JET ASSEMBLY
226
00:15:11,827 --> 00:15:13,965
ON THE BACK
OF A STEEL MOUNTING PLATE
227
00:15:13,965 --> 00:15:16,517
AND SECURES IT WITH SCREWS.
228
00:15:20,758 --> 00:15:24,310
HE INSERTS TWO L.E.D. LIGHTS
IN SPECIALLY DESIGNED SLOTS,
229
00:15:24,310 --> 00:15:26,517
THEN SCREWS THEM IN PLACE.
230
00:15:30,034 --> 00:15:32,724
THIS WATER-JET FOUNTAIN
IS NOW COMPLETE.
231
00:15:32,724 --> 00:15:37,586
HE HOOKS IT UP TO A COMPRESSED
AIR SOURCE FOR A DRY-BENCH TEST.
232
00:15:37,586 --> 00:15:40,931
HE CONFIRMS THAT THE COMPRESSED
AIR MOVES THE CARRIAGE CORRECTLY
233
00:15:40,931 --> 00:15:44,931
IN THE PROGRAMMED SEQUENCE.
234
00:15:44,931 --> 00:15:48,034
HE ALSO CONNECTS THE WATER JET
TO A MECHANICAL SEQUENCER
235
00:15:48,034 --> 00:15:50,448
TO VERIFY THAT IT'S FUNCTIONAL.
236
00:15:53,103 --> 00:15:54,931
AFTER IT PASSES THE TESTS,
237
00:15:54,931 --> 00:15:57,655
HE SEALS THE PERIMETER
OF THE JET WITH A RUBBER GASKET
238
00:15:57,655 --> 00:15:59,620
AND THE FACEPLATE.
239
00:16:02,655 --> 00:16:07,517
THIS WATER-JET FOUNTAIN
IS READY FOR INSTALLATION.
240
00:16:07,517 --> 00:16:09,241
WHEN COMBINED
WITH OTHER FOUNTAINS,
241
00:16:09,241 --> 00:16:12,517
IT WILL PUT ON QUITE A SHOW.
242
00:16:12,517 --> 00:16:14,448
ONLOOKERS WILL BE SO ENGAGED,
243
00:16:14,448 --> 00:16:16,931
THEY WON'T MIND
GETTING A LITTLE WET.
244
00:16:32,379 --> 00:16:34,689
Narrator: PEOPLE HAVE BEEN
SURFING ON WOODEN BOARDS
245
00:16:34,689 --> 00:16:36,379
FOR THOUSANDS OF YEARS.
246
00:16:36,379 --> 00:16:37,655
THESE EARLY SURFBOARDS
247
00:16:37,655 --> 00:16:40,551
WERE HEAVY BECAUSE THEY WERE
MADE OF SOLID WOOD.
248
00:16:40,551 --> 00:16:43,724
TODAY, SURFERS
ARE TAKING THIS CLASSIC MATERIAL
249
00:16:43,724 --> 00:16:45,931
AND GIVING IT A MODERN TWIST,
250
00:16:45,931 --> 00:16:47,931
CREATING BEAUTIFUL,
LIGHTWEIGHT BOARDS
251
00:16:47,931 --> 00:16:50,103
FROM SUSTAINABLE RESOURCES.
252
00:16:53,724 --> 00:16:55,724
WHEN MOST PEOPLE
THINK OF SURFBOARDS,
253
00:16:55,724 --> 00:16:57,689
THEY PICTURE
BRIGHTLY COLORED BOARDS
254
00:16:57,689 --> 00:16:59,896
MADE OF FOAM AND FIBERGLASS.
255
00:16:59,896 --> 00:17:04,448
BUT WOODEN SURFBOARDS ARE MAKING
A NOT-SO-SURPRISING COMEBACK.
256
00:17:06,103 --> 00:17:09,551
EVERY WATERBORNE VESSEL
WAS ORIGINALLY MADE FROM TREES
257
00:17:09,551 --> 00:17:14,103
BECAUSE,
NO MATTER WHAT, WOOD FLOATS.
258
00:17:16,551 --> 00:17:22,275
THEY START BY GLUING TWO PLANKS
OF POPLAR TO A STRIP OF OAK.
259
00:17:22,275 --> 00:17:23,689
USING A TEMPLATE,
260
00:17:23,689 --> 00:17:28,551
A CRAFTSMAN DRAWS THE SHAPE
HE WANTS FOR THE SURFBOARD.
261
00:17:28,551 --> 00:17:32,793
HE USES A JAPANESE PULL SAW
TO CUT THE SHAPE OUT BY HAND.
262
00:17:32,793 --> 00:17:37,379
THIS IS THE BASIC OUTLINE
OF THE SURFBOARD.
263
00:17:37,379 --> 00:17:40,068
A CNC ROUTER
QUICKLY AND ACCURATELY CUTS
264
00:17:40,068 --> 00:17:43,586
THE INNER SUPPORT FRAMEWORK
FROM POPLAR PLYWOOD.
265
00:17:44,862 --> 00:17:46,275
THE BUILDER SOURCES WOOD
266
00:17:46,275 --> 00:17:50,034
FROM SUPPLIERS WHO USE
SUSTAINABLE FORESTRY PRACTICES.
267
00:17:52,482 --> 00:17:54,758
USING HIS PULL SAW,
THE CRAFTSMAN
268
00:17:54,758 --> 00:17:58,137
CAREFULLY FREES THE PIECES
OF THE SUPPORT FRAMEWORK.
269
00:18:01,827 --> 00:18:05,517
THEN HE SMOOTHES THE EDGES
WITH A BLOCK SANDER.
270
00:18:05,517 --> 00:18:09,517
HE BEGINS FITTING THE PIECES
TOGETHER TO FORM THE FRAMEWORK.
271
00:18:09,517 --> 00:18:13,482
FOR THE SPINE, THE BUILDER
USES FAST-DRYING SUPERGLUE.
272
00:18:13,482 --> 00:18:18,758
IT BONDS POWERFULLY AND QUICKLY,
ALLOWING HIM TO WORK FAST.
273
00:18:18,758 --> 00:18:20,275
AFTER COMPLETING THE SPINE,
274
00:18:20,275 --> 00:18:24,172
HE STARTS GLUING
AND INSERTING THE RIBS.
275
00:18:24,172 --> 00:18:28,896
THE FINISHED FRAME RESEMBLES
THE SKELETON OF A LARGE FISH.
276
00:18:28,896 --> 00:18:33,862
ONCE THE SUPPORT STRUCTURE
HAS DRIED, THE CRAFTSMAN
277
00:18:33,862 --> 00:18:37,965
PLACES IT ON THE BOTTOM SKIN
OF THE SURFBOARD.
278
00:18:37,965 --> 00:18:39,655
HE POSITIONS IT CAREFULLY
279
00:18:39,655 --> 00:18:43,862
AND SECURELY CLAMPS IT IN PLACE
ON A PURPOSE-BUILT JIG.
280
00:18:46,551 --> 00:18:50,000
THEN HE TRACES THE LINES
OF THE FRAME ON TO THE SKIN.
281
00:18:50,000 --> 00:18:51,965
HE MEASURES AND MARKS
A SET DISTANCE
282
00:18:51,965 --> 00:18:54,034
FROM THE END OF EACH RIB.
283
00:18:58,758 --> 00:19:00,034
HE SQUEEZES A BEAD
284
00:19:00,034 --> 00:19:02,931
OF EPOXY-BASED GLUE
OVER THE NETWORK OF LINES
285
00:19:02,931 --> 00:19:07,793
BEFORE LIFTING THE FRAME
INTO POSITION ON THE SKIN.
286
00:19:07,793 --> 00:19:11,793
HE CLAMPS EVERYTHING DOWN
AND LETS IT DRY OVERNIGHT.
287
00:19:14,551 --> 00:19:17,241
THE SIDES OF THE SURFBOARD,
CALLED THE RAILS,
288
00:19:17,241 --> 00:19:22,931
CONSIST OF 12 STRIPS OF WOOD
GLUED AND CLAMPED TOGETHER.
289
00:19:22,931 --> 00:19:25,482
THE RAILS TAKE SEVERAL DAYS
TO MAKE.
290
00:19:28,758 --> 00:19:30,655
AFTER THAT PROCESS IS COMPLETE,
291
00:19:30,655 --> 00:19:33,206
THE BUILDER LAYS A BEAD
OF POLYURETHANE GLUE
292
00:19:33,206 --> 00:19:37,517
ON THE FRAME AND RAILS.
293
00:19:37,517 --> 00:19:41,758
THEN HE LOWERS THE SURFBOARD'S
TOP SKIN INTO POSITION
294
00:19:41,758 --> 00:19:44,689
AND SECURES IT WITH DOZENS
OF CLAMPS.
295
00:19:44,689 --> 00:19:48,034
HE LETS THE FULLY ASSEMBLED
BOARD DRY OVERNIGHT.
296
00:19:50,862 --> 00:19:55,758
NOW THE BOARD IS READY FOR
THE LAST PHASE OF PRODUCTION.
297
00:19:55,758 --> 00:19:58,724
FIRST, THE CRAFTSMAN SHAPES
AND SMOOTHES THE WOOD
298
00:19:58,724 --> 00:20:02,241
TO GIVE THE OBJECT
ITS FINAL SHAPE.
299
00:20:05,758 --> 00:20:08,931
HE TRIMS THE EXCESS WOOD
OFF THE SIDES USING THE RAILS
300
00:20:08,931 --> 00:20:11,000
AS A CUTTING GUIDE.
301
00:20:16,586 --> 00:20:18,862
HE ROUNDS THE TOP EDGES
OF THE BOARD
302
00:20:18,862 --> 00:20:22,206
WITH A SMALL,
JAPANESE-MADE WOOD PLANE.
303
00:20:33,620 --> 00:20:37,034
THE BUILDER ALSO USES
A SPECIAL TOOL CALLED A SAW RASP
304
00:20:37,034 --> 00:20:38,896
TO FINISH THE EDGES.
305
00:20:38,896 --> 00:20:41,482
HE USES A SQUARE
TO MAKE SURE THE BOTTOM AND TOP
306
00:20:41,482 --> 00:20:44,344
ARE EVEN
WHEN SHAPING THE NOSE AND TAIL.
307
00:20:47,689 --> 00:20:50,551
THE SAW RASP ALLOWS HIM
TO QUICKLY AND EFFICIENTLY
308
00:20:50,551 --> 00:20:53,034
BRING THE BOARD
TO ITS FINAL SHAPE.
309
00:20:53,034 --> 00:20:55,965
NEXT, THE CRAFTSMAN
USES A SANDING BLOCK
310
00:20:55,965 --> 00:20:58,275
WITH INCREASINGLY FINER
GRITS OF SANDPAPER
311
00:20:58,275 --> 00:21:01,000
TO CREATE A SMOOTH SURFACE.
312
00:21:04,586 --> 00:21:07,689
HE SIGNS THE BOTTOM OF THE BOARD
WITH A PENCIL,
313
00:21:07,689 --> 00:21:12,137
THEN BURNS IT INTO THE WOOD WITH
A TOOL CALLED A PYROGRAPHY PEN.
314
00:21:15,793 --> 00:21:18,103
HE ADDS A LAYER
OF FIBERGLASS AND EPOXY
315
00:21:18,103 --> 00:21:21,586
TO GIVE THE WOOD
A TOUGH OUTER SHELL.
316
00:21:21,586 --> 00:21:23,655
CUSTOMERS CAN CHOOSE
TO HAVE A FIN BOX
317
00:21:23,655 --> 00:21:25,896
WITH A REMOVABLE FIN
318
00:21:25,896 --> 00:21:30,137
OR THEY CAN OPT
FOR A PERMANENT WOODEN ONE.
319
00:21:30,137 --> 00:21:33,000
TRADITIONAL MATERIAL
PLUS AN INNOVATIVE DESIGN
320
00:21:33,000 --> 00:21:36,068
RESULTS IN WOODEN SURFBOARDS
THAT ARE BUILT TO LAST.
25609
Can't find what you're looking for?
Get subtitles in any language from opensubtitles.com, and translate them here.