Would you like to inspect the original subtitles? These are the user uploaded subtitles that are being translated:
1
00:00:01,620 --> 00:00:04,620
--Captions by VITAC--
www.vitac.com
2
00:00:04,620 --> 00:00:07,620
CAPTIONS PAID FOR BY
DISCOVERY COMMUNICATIONS
3
00:00:52,931 --> 00:00:54,275
Narrator: SIXTY YEARS AGO,
4
00:00:54,275 --> 00:00:57,275
SURFERS IN CALIFORNIA
WERE LOOKING TO RIDE THE STREETS
5
00:00:57,275 --> 00:00:58,862
LIKE THEY SURF THE WAVES.
6
00:00:58,862 --> 00:01:00,344
THEY CAME UP WITH AN IDEA
7
00:01:00,344 --> 00:01:03,241
TO STRAP ROLLER SKATE WHEELS
ON THEIR SURFBOARDS,
8
00:01:03,241 --> 00:01:05,275
AND THE SKATEBOARD WAS BORN.
9
00:01:05,275 --> 00:01:09,206
SINCE THEN, SKATEBOARDING HAS
EVOLVED INTO A SPORT, A PASSION
10
00:01:09,206 --> 00:01:14,344
AND A LIFESTYLE
FOR PEOPLE ALL OVER THE WORLD.
11
00:01:14,344 --> 00:01:16,517
IN A BACKYARD POOL, A SKATER
12
00:01:16,517 --> 00:01:20,793
GAUGES THE FEEL AND RESPONSE
OF THESE RECYCLED SKATEBOARDS.
13
00:01:27,551 --> 00:01:30,034
RECYCLED SKATEBOARDS
GIVE NEW LIFE
14
00:01:30,034 --> 00:01:32,689
TO UNRIDEABLE OLD BOARDS.
15
00:01:32,689 --> 00:01:36,517
THE BOARDS ON THIS RACK WOULD
NORMALLY END UP IN A LANDFILL.
16
00:01:39,827 --> 00:01:42,517
FIRST, THE DESIGNER
HEATS UP THE OLD GRIP TAPE
17
00:01:42,517 --> 00:01:43,758
AND PEELS IT OFF.
18
00:01:43,758 --> 00:01:47,413
THIS REVEALS THE BOARD'S
ORIGINAL GRAPHICS.
19
00:01:50,413 --> 00:01:53,758
HE GRINDS OFF THE GRAPHICS,
LEAVING BARE WOOD.
20
00:01:58,758 --> 00:02:03,655
HE APPLIES EPOXY ON TOP
OF A COLORED VENEER COATING
21
00:02:03,655 --> 00:02:04,793
AND STACKS THE BOARDS
22
00:02:04,793 --> 00:02:07,413
ON THE TABLE
OF A BOTTLE JACK PRESS.
23
00:02:09,482 --> 00:02:10,724
HE GLUES ANOTHER BOARD
24
00:02:10,724 --> 00:02:14,344
AND PLACES IT ON TOP
OF THE FIRST ONE.
25
00:02:14,344 --> 00:02:19,275
HE REPEATS THIS STACK PROCESS
WITH DIFFERENT COLORED BOARDS.
26
00:02:19,275 --> 00:02:21,862
THE STACKING CONTINUES
UNTIL THE DESIGNER
27
00:02:21,862 --> 00:02:24,448
HAS ABOUT 20 BOARDS
ON THE TABLE.
28
00:02:24,448 --> 00:02:27,827
HE PUTS THE BOTTLE JACKS
IN PLACE AND CRANKS THEM UP.
29
00:02:30,551 --> 00:02:33,655
EACH JACK APPLIES 10 TONS
OF COMPRESSION,
30
00:02:33,655 --> 00:02:36,724
PRESSING THE BOARDS TOGETHER
WHILE THE EPOXY CURES
31
00:02:36,724 --> 00:02:39,000
AND THE EXCESS GLUE DRIPS OUT.
32
00:02:41,275 --> 00:02:47,517
THE DESIGNER MAKES A CROSS CUT
IN THE STACK WITH A BANDSAW.
33
00:02:47,517 --> 00:02:51,344
EACH NEW BOARD HE MAKES COMES
WITH A UNIQUE COLOR DESIGN.
34
00:02:54,517 --> 00:02:59,379
A WORKER TRACES A CUTTING MARK
ON THE BOARD
35
00:02:59,379 --> 00:03:02,448
AND MAKES A ROUGH CUT
ALONG IT WITH A JIGSAW.
36
00:03:05,517 --> 00:03:07,448
HE SANDS DOWN THE ROUGH PROFILE
37
00:03:07,448 --> 00:03:10,586
OF THE BOARD USING
A TABLE-MOUNTED BELT SANDER.
38
00:03:15,068 --> 00:03:17,310
BEFORE THE BOARD
GOES TO SILK SCREENING,
39
00:03:17,310 --> 00:03:19,896
HE USES A CUSTOM TEMPLATE
TO DRILL HOLES
40
00:03:19,896 --> 00:03:21,758
FOR THE ASSEMBLY BOLTS.
41
00:03:24,758 --> 00:03:27,172
A DESIGNER POURS WATER-BASED INK
42
00:03:27,172 --> 00:03:31,655
ON TOP
OF A SCREEN PRINTING MESH.
43
00:03:31,655 --> 00:03:33,068
HE TAKES A SQUEEGEE
44
00:03:33,068 --> 00:03:35,206
AND PULLS THE INK
THROUGH THE MEMBRANE
45
00:03:35,206 --> 00:03:38,517
TO PRINT THE COMPANY LOGO
ONTO THE BOARD.
46
00:03:38,517 --> 00:03:40,827
HE REMOVES
THE SILK SCREENING FRAME,
47
00:03:40,827 --> 00:03:44,310
AND THE BOARD CONTINUES ON
TO THE EPOXY PHASE.
48
00:03:46,379 --> 00:03:51,241
A WORKER POURS EPOXY RESIN
ON TOP OF A FIBERGLASS CLOTH.
49
00:03:51,241 --> 00:03:53,827
HE SPREADS OUT THE EPOXY
WITH A SQUEEGEE
50
00:03:53,827 --> 00:03:56,344
IN A SLOW, CONSTANT MOTION.
51
00:03:56,344 --> 00:03:58,896
THIS KEEPS AIR BUBBLES,
RUNS, OR DRIPS
52
00:03:58,896 --> 00:04:02,068
FROM RUINING THE FINISH
OF THE BOARD.
53
00:04:02,068 --> 00:04:04,379
THE CLOTH ABSORBS THE RESIN.
54
00:04:06,689 --> 00:04:10,172
THE WORKER CUTS OFF THE EXCESS
CLOTH WITH A RAZOR BLADE
55
00:04:10,172 --> 00:04:12,586
AND APPLIES A FINISH COAT
OF EPOXY,
56
00:04:12,586 --> 00:04:15,586
COMPLETING THE BOARD'S COVERING.
57
00:04:15,586 --> 00:04:17,068
A WORKER USES A ROUTER
58
00:04:17,068 --> 00:04:21,620
TO SMOOTH OUT THE CURVE
OF A DIFFERENT BOARD.
59
00:04:21,620 --> 00:04:26,724
HE FINISHES THE BOARD PROFILE
WITH FINE SANDING PAPER.
60
00:04:26,724 --> 00:04:29,241
A WORKER SPRINKLES
RECYCLED CRUSHED GLASS
61
00:04:29,241 --> 00:04:31,586
ON THE EPOXY-COVERED BOARD.
62
00:04:31,586 --> 00:04:35,551
THIS WILL PROVIDE GRIP FOR
THE BOARD INSTEAD OF GRIP TAPE.
63
00:04:35,551 --> 00:04:38,034
BEFORE THE RESIN HARDENS
AND CURES,
64
00:04:38,034 --> 00:04:42,206
HE PRESSES THE GLASS
INTO THE EPOXY WITH A WHEEL.
65
00:04:42,206 --> 00:04:47,034
HE SANDS THE BOTTOM OF THE BOARD
WITH A SANDING BLOCK.
66
00:04:47,034 --> 00:04:50,448
HE GOES THROUGH SEVEN
DIFFERENT GRITS OF SAND PAPER.
67
00:04:50,448 --> 00:04:51,896
THEN THE BOARD IS WASHED
68
00:04:51,896 --> 00:04:55,827
AND POLISHED BEFORE STARTING
THE FINAL ASSEMBLY PROCESS.
69
00:04:55,827 --> 00:04:58,172
A WORKER ASSEMBLES THE WHEELS
ON A TRUCK
70
00:04:58,172 --> 00:05:01,758
AND BOLTS THEM ON WITH HEX NUTS.
71
00:05:01,758 --> 00:05:03,586
HE TIGHTENS THE WHEELS
WITH A WRENCH
72
00:05:03,586 --> 00:05:06,655
UNTIL HE'S REACHED
THE DESIRED TORQUE RATIO
73
00:05:06,655 --> 00:05:09,586
AND GIVES THEM A TEST SPIN.
74
00:05:09,586 --> 00:05:12,034
HE INSERTS BOLTS
THROUGH THE BOARD
75
00:05:12,034 --> 00:05:15,689
AND PLACES A URETHANE RISER PAD
UNDERNEATH THE SKATE DECK.
76
00:05:15,689 --> 00:05:18,000
THEN HE STARTS
ASSEMBLING THE TRUCK.
77
00:05:20,758 --> 00:05:24,655
HE USES A SCREW GUN TO SECURE
THE WHEEL TRUCKS IN PLACE.
78
00:05:30,034 --> 00:05:32,931
EACH SKATEBOARD IS EQUIPPED
WITH POLYURETHANE WHEELS
79
00:05:32,931 --> 00:05:34,931
MOUNTED ON METAL TRUCKS.
80
00:05:34,931 --> 00:05:38,620
THESE ALLOW THE RIDER
TO STEER AND CONTROL THE BOARD.
81
00:05:38,620 --> 00:05:41,620
RECYCLED SKATEBOARDS ARE MADE
FORM A WIDE VARIETY
82
00:05:41,620 --> 00:05:45,068
OF SHAPES, DECK SIZES,
WHEELS AND TRUCKS,
83
00:05:45,068 --> 00:05:49,241
SUITING EACH RIDER'S UNIQUE
TASTES AND PERFORMANCE NEEDS.
84
00:05:59,034 --> 00:06:00,275
Narrator: MANY YEARS AGO,
85
00:06:00,275 --> 00:06:02,689
DANISH BAKERS
GOT CREATIVE WITH PASTRY DOUGH.
86
00:06:02,689 --> 00:06:04,344
THEY BEGAN BRAIDING IT,
87
00:06:04,344 --> 00:06:06,827
PUTTING A WHOLE NEW TWIST
ON DESERTS.
88
00:06:06,827 --> 00:06:08,793
BRAIDED PASTRY
LOOKS MORE ELABORATE
89
00:06:08,793 --> 00:06:10,275
THAN ORDINARY PASTRY.
90
00:06:10,275 --> 00:06:13,000
THE FLAKINESS OF THE DOUGH
AND THE SCRUMPTIOUS FILLINGS
91
00:06:13,000 --> 00:06:16,241
MAKE BRAIDED PASTRY TASTE
AS GOOD AS IT LOOKS.
92
00:06:20,413 --> 00:06:22,103
FACTORY-MADE BRAIDED PASTY
93
00:06:22,103 --> 00:06:25,379
CAN BE KEPT FROZEN
UNTIL YOU'RE READY TO EAT IT.
94
00:06:25,379 --> 00:06:27,275
AFTER JUST A FEW MINUTES
IN THE OVEN,
95
00:06:27,275 --> 00:06:29,896
YOU WILL HAVE
A FRESH-BAKED DESERT.
96
00:06:29,896 --> 00:06:33,344
THE PASTRY LOOKS AS THOUGH IT
TAKES MANY HOURS TO PREPARE,
97
00:06:33,344 --> 00:06:37,482
BUT OF COURSE,
IT IS NO TROUBLE AT ALL.
98
00:06:37,482 --> 00:06:39,172
TO PRODUCE BRAIDED PASTRY,
99
00:06:39,172 --> 00:06:41,862
THIS FACTORY USES A NUMBER
OF INGREDIENTS,
100
00:06:41,862 --> 00:06:45,551
INCLUDING YEAST...
101
00:06:45,551 --> 00:06:48,689
GRANULATED SUGAR...
102
00:06:48,689 --> 00:06:52,241
PASTRY FLOUR....
103
00:06:52,241 --> 00:06:55,344
...DRIED EGGS AND WATER.
104
00:06:55,344 --> 00:06:59,241
THE INGREDIENTS GO INTO A LARGE
REFRIGERATED MIXER.
105
00:06:59,241 --> 00:07:01,413
THE COOLING KEEPS
THE YEAST DORMANT
106
00:07:01,413 --> 00:07:04,068
AS BEATERS WORK THE INGREDIENTS
INTO DOUGH.
107
00:07:06,310 --> 00:07:08,000
AFTER THE DOUGH
LEAVES THE MIXER,
108
00:07:08,000 --> 00:07:10,206
IT TUMBLES INTO A HOPPER.
109
00:07:10,206 --> 00:07:13,827
A CUTTER WHEEL CHOPS THE DOUGH
INTO SEVERAL PIECES.
110
00:07:13,827 --> 00:07:16,517
THE PIECES OF DOUGH TRAVEL
BETWEEN CONVEYORS
111
00:07:16,517 --> 00:07:18,965
THAT SQUEEZE THEM
INTO RIBBONS OF DOUGH
112
00:07:18,965 --> 00:07:21,068
THAT WILL BE FED TO AN EXTRUDER.
113
00:07:24,413 --> 00:07:27,034
THE EXTRUDER SHAPES
THE ELONGATED DOUGH PIECES
114
00:07:27,034 --> 00:07:29,241
INTO ONE CONTINUOUS SHEET.
115
00:07:33,862 --> 00:07:35,827
AT THE EXIT OF THE EXTRUDER,
116
00:07:35,827 --> 00:07:38,689
AN EMPLOYEE
DUSTS THE CONVEYOR WITH FLOUR.
117
00:07:38,689 --> 00:07:41,896
THIS PREVENTS THE DOUGH
FROM STICKING TO IT.
118
00:07:41,896 --> 00:07:44,655
A PUMP AT THE EXTRUDER EXIT
SPREADS BIG BLOCKS
119
00:07:44,655 --> 00:07:48,172
OF SOFT BUTTER ACROSS
THE NEWLY FORMED SHEET OF DOUGH.
120
00:07:51,965 --> 00:07:53,206
DOWN THE CONVEYOR,
121
00:07:53,206 --> 00:07:55,793
PLOW-LIKE FLAPS
FOLD THE BUTTERED DOUGH OVER,
122
00:07:55,793 --> 00:07:58,655
CREATING A DOUBLE LAYER.
123
00:07:58,655 --> 00:08:01,379
THIS FOLDING PROCESS,
CALLED LAMINATION,
124
00:08:01,379 --> 00:08:04,206
WILL BUILD UP MULTIPLE LAYERS
OF BUTTERED DOUGH,
125
00:08:04,206 --> 00:08:06,931
RESULTING
IN A VERY FLAKY PASTRY.
126
00:08:10,620 --> 00:08:12,758
NEXT, THE DOUGH
TRAVELS INTO A DRUM
127
00:08:12,758 --> 00:08:14,793
WITH SPINNING ROLLING PINS.
128
00:08:14,793 --> 00:08:18,793
THESE ROLLING PINS FLATTEN
THE FOLDED DOUGH SIGNIFICANTLY,
129
00:08:18,793 --> 00:08:21,586
COMPRESSING THE LAYERS
INTO ONE THIN SHEET.
130
00:08:23,517 --> 00:08:25,862
NOW, A CONVEYOR
TAKES THE COMPRESSED SHEET
131
00:08:25,862 --> 00:08:28,551
THROUGH A DEVICE
THAT WILL FOLD THE DOUGH AGAIN.
132
00:08:36,206 --> 00:08:39,344
NEXT, ROLLING PINS
SQUEEZE THE STACK OF DOUGH
133
00:08:39,344 --> 00:08:41,827
INTO A SINGLE PIECE ONCE AGAIN.
134
00:08:47,724 --> 00:08:50,689
REVOLVING CUTTERS
SLICE THE LAMINATED DOUGH
135
00:08:50,689 --> 00:08:52,034
AS IT MOVES FORWARD.
136
00:08:52,034 --> 00:08:55,241
THE CUTS CREATE ANGLED STRIPS
FOR BRAIDING.
137
00:09:00,482 --> 00:09:03,103
AT THE NEXT STATION,
A SWEET CHERRY FILLING
138
00:09:03,103 --> 00:09:07,241
WITH A JAM-LIKE CONSISTENCY
IS WAITING.
139
00:09:07,241 --> 00:09:10,758
NOZZLES DEPOSIT PRECISE AMOUNTS
OF CHERRY FILLING
140
00:09:10,758 --> 00:09:12,896
BETWEEN THE ANGLED CUTS.
141
00:09:12,896 --> 00:09:16,551
NEXT, WORKERS BRAID THE DOUGH
OVER THE CENTER FILLING,
142
00:09:16,551 --> 00:09:19,344
CREATING
AN ATTRACTIVE-LOOKING PASTRY.
143
00:09:22,517 --> 00:09:23,758
SENSORS DETERMINE
144
00:09:23,758 --> 00:09:26,827
WHERE THE BLADE
WILL SLICE THE BRAIDED PASTRIES.
145
00:09:31,655 --> 00:09:33,655
THE BRAIDED PASTRIES
ARE TRANSFERRED
146
00:09:33,655 --> 00:09:35,724
TO ANOTHER CONVEYOR
WITH A SCALE.
147
00:09:35,724 --> 00:09:37,724
THE SCALE CONFIRMS THAT THERE IS
148
00:09:37,724 --> 00:09:41,551
A SUFFICIENT AMOUNT OF FILLING
IN EACH PASTRY.
149
00:09:41,551 --> 00:09:44,413
THE BRAIDED PASTRIES
NOW HEAD INTO A FREEZER
150
00:09:44,413 --> 00:09:48,551
SET A TEMPERATURE
OF 29 DEGREES BELOW ZERO.
151
00:09:48,551 --> 00:09:50,172
INSIDE THE FREEZER,
152
00:09:50,172 --> 00:09:54,103
THE PASTRIES REVOLVE
ON CAROUSELS FOR 45 MINUTES.
153
00:09:54,103 --> 00:09:58,000
THIS GRADUAL FREEZING PROCESS
PRESERVES THE YEAST.
154
00:10:00,344 --> 00:10:02,482
NEXT, THE PASTRIES
WIND THEIR WAY
155
00:10:02,482 --> 00:10:05,551
TOWARD THE PACKAGING STATION.
156
00:10:05,551 --> 00:10:07,862
HERE, WORKERS PLACE
A PACKET OF ICING
157
00:10:07,862 --> 00:10:09,689
UNDER EACH BRAIDED PASTRY
158
00:10:09,689 --> 00:10:12,448
AND SEND THEM
TO AN AUTOMATED PACKAGER.
159
00:10:17,379 --> 00:10:21,000
MACHINES WRAP A PLASTIC SLEEVE
AROUND THE PASTY.
160
00:10:23,413 --> 00:10:24,551
TO MINIMIZE THE AMOUNT
161
00:10:24,551 --> 00:10:26,827
OF TIME THE PASTRY
IS OUT OF THE FREEZER,
162
00:10:26,827 --> 00:10:29,034
THINGS MUST MOVE QUICKLY.
163
00:10:31,413 --> 00:10:33,896
THE PASTRIES
PASS OVER A WEIGH STATION
164
00:10:33,896 --> 00:10:38,379
TO CONFIRM THE CORRECT AMOUNT
HAS BEEN PACKAGED.
165
00:10:38,379 --> 00:10:41,689
WHEN BAKED,
THE PASTRY RISES SIGNIFICANTLY,
166
00:10:41,689 --> 00:10:45,068
ALLOWING THE BRAIDED PROFILE
TO EXPAND.
167
00:10:45,068 --> 00:10:48,965
THE LAYERS OF DOUGH SEPARATE
AND BECOME FLAKY.
168
00:10:48,965 --> 00:10:51,896
THE CHERRY FILLING SEEPS
INTO THE PASTRY.
169
00:10:51,896 --> 00:10:55,482
ENDINGS DON'T GET
MUCH SWEETER THAN THIS.
170
00:11:06,896 --> 00:11:08,517
Narrator:
PASS BY ANY CONSTRUCTION SITE,
171
00:11:08,517 --> 00:11:10,000
AND YOU'LL PROBABLY SEE
A TRAILER.
172
00:11:10,000 --> 00:11:13,172
CONSTRUCTION TRAILERS PROVIDE
ROOM FOR AN ON-SITE OFFICE
173
00:11:13,172 --> 00:11:15,931
OR LUNCH ROOM
FOR THE CONSTRUCTION WORKERS.
174
00:11:15,931 --> 00:11:19,344
A TRAILER CAN ALSO BE USED
AS A DECONTAMINATION ROOM
175
00:11:19,344 --> 00:11:21,827
FOR WORKERS TO REMOVE
THEIR PROTECTIVE CLOTHING
176
00:11:21,827 --> 00:11:26,275
AND SHOWER AFTER HANDLING
HAZARDOUS MATERIALS.
177
00:11:26,275 --> 00:11:29,827
CONSTRUCTION TRAILERS
ARE TYPICALLY 10 TO 13 FEET WIDE
178
00:11:29,827 --> 00:11:32,241
AND UP TO 59 FEET LONG.
179
00:11:36,275 --> 00:11:38,448
THE INSIDE OF THE TRAILER
CAN BE EQUIPPED
180
00:11:38,448 --> 00:11:40,482
FOR WHATEVER FUNCTION
IT WILL SERVE.
181
00:11:45,310 --> 00:11:49,931
THE STRUCTURE OF THE TRAILER
IS MADE OF SPRUCE, PINE, OR FIR.
182
00:11:49,931 --> 00:11:53,689
WORKERS START WITH AN UNDERFLOOR
MADE OF WOOD PARTICLE BOARD.
183
00:11:53,689 --> 00:11:57,000
THEN THEY NAIL FLOOR JOISTS
TO THE BOAR AND FRAME THEM.
184
00:11:57,000 --> 00:12:00,068
THE INSULATE THE FLOOR
WITH FIBERGLASS WOOL
185
00:12:00,068 --> 00:12:03,206
AND NAIL A PLYWOOD SUBFLOOR
ON TOP.
186
00:12:03,206 --> 00:12:06,344
THEN THEY SPREAD TILE GLUE
OVER THE SUBFLOOR.
187
00:12:06,344 --> 00:12:10,068
THE GLUE IS FREEZE-PROOF
AND MOLD RESISTANT.
188
00:12:10,068 --> 00:12:12,206
THEY COMPLETE THE FLOOR
BY LAYING DOWN
189
00:12:12,206 --> 00:12:15,034
COMMERCIAL-GRADE VINYL TILE
OR LINOLEUM.
190
00:12:18,275 --> 00:12:20,000
TO BUILD THE WALLS
OF THE TRAILER.
191
00:12:20,000 --> 00:12:22,137
THEY NAIL PIECES OF WOODS
CALLED STUDS
192
00:12:22,137 --> 00:12:25,413
EVERY 15 INCHES
ALONG THE SOLE PLATE.
193
00:12:25,413 --> 00:12:29,413
THE SOLE PLATE IS THE BOTTOM
SECTION OF THE TRAILER'S WALL.
194
00:12:29,413 --> 00:12:33,068
THEN THEY BUILD ROUGH OPENINGS
FOR THE WINDOWS AND DOORS.
195
00:12:33,068 --> 00:12:35,758
FINALLY, THEY NAIL
ANOTHER HORIZONTAL PIECE
196
00:12:35,758 --> 00:12:37,551
ALONG THE TOP OF THE STUDS.
197
00:12:37,551 --> 00:12:40,379
THIS IS CALLED
THE DOUBLE TOP PLATE.
198
00:12:40,379 --> 00:12:43,137
THE STRUCTURE
OF THE WALL IS COMPLETE.
199
00:12:43,137 --> 00:12:46,000
NOW, THEY APPLY GLUE
TO THE STUDS AND NAIL
200
00:12:46,000 --> 00:12:48,000
ON A SHEET OF PLYWOOD
TO THE LOWER PART
201
00:12:48,000 --> 00:12:49,827
OF THE WALL STRUCTURE.
202
00:12:49,827 --> 00:12:51,517
THEY REPEAT THIS PROCESS
203
00:12:51,517 --> 00:12:54,241
WITH THE THREE OTHER WALLS
OF THE TRAILER.
204
00:12:56,379 --> 00:12:58,068
THEN THEY RAISE EACH WALL
205
00:12:58,068 --> 00:13:01,551
AND NAIL A SOLE PLATE
TO THE FLOOR.
206
00:13:01,551 --> 00:13:05,517
THE PLYWOOD EXTERIOR WALL
EXTENDS BELOW THE SOLE PLATE,
207
00:13:05,517 --> 00:13:08,275
COVERING THE SIDE
OF THE FLOOR FRAME.
208
00:13:08,275 --> 00:13:10,586
THEY GLUE THE PLYWOOD
TO THE FLOOR FRAME
209
00:13:10,586 --> 00:13:12,827
AND REINFORCE IT WITH NAILS.
210
00:13:15,931 --> 00:13:18,517
NEXT, THE ROOF OF THE TRAILER --
211
00:13:18,517 --> 00:13:20,965
IT IS CONSTRUCTED IN LAYERS.
212
00:13:20,965 --> 00:13:24,103
FIRST, THEY LAY
DOWN THE FIBER BOARD CEILING,
213
00:13:26,206 --> 00:13:29,689
THEN INSTALL
A PLASTIC VAPOR BARRIER.
214
00:13:29,689 --> 00:13:32,034
NEXT, THE ROOF JOISTS --
215
00:13:32,034 --> 00:13:35,758
THE JOISTS HAVE SLOPED EDGES
TO DRAIN WATER OFF THE ROOF
216
00:13:35,758 --> 00:13:38,965
AND HOLES
FOR ELECTRIC CABLES.
217
00:13:38,965 --> 00:13:41,000
ONCE THE JOISTS ARE INSTALLED,
218
00:13:41,000 --> 00:13:46,034
WORKERS FRAME THE ROOF STRUCTURE
WITH END PLATES.
219
00:13:46,034 --> 00:13:48,241
THEN THEY THREAD IN
ELECTRIC CABLES
220
00:13:48,241 --> 00:13:50,896
FOR THE LIGHTS, OUTLETS,
BASEBOARD HEATERS,
221
00:13:50,896 --> 00:13:52,896
AND OTHER ELECTRICAL COMPONENTS.
222
00:13:55,000 --> 00:13:58,448
NOW, THEY BEGIN THEIR WORK
INSIDE THE TRAILER.
223
00:13:58,448 --> 00:14:01,000
FIRST,
FIBERGLASS WOOL INSULATION
224
00:14:01,000 --> 00:14:03,344
IS INSTALLED BETWEEN THE STUDS.
225
00:14:06,689 --> 00:14:08,965
A PLASTIC VAPOR BARRIER
IS ADDED.
226
00:14:08,965 --> 00:14:11,827
THEN THEY INSTALL
SMOOTH WOOD PANELS.
227
00:14:11,827 --> 00:14:16,000
THE WOOD PANELS ARE LAMINATED
WITH VINYL FOR A CLEAN FINISH.
228
00:14:16,000 --> 00:14:17,448
AT THE SAME TIME,
229
00:14:17,448 --> 00:14:21,103
WORK CONTINUES ON THE OUTSIDE
OF THE CONSTRUCTION TRAILER.
230
00:14:21,103 --> 00:14:24,586
UNDER THE FLOOR, WORKERS
INSTALL ONE TO THREE AXLES.
231
00:14:24,586 --> 00:14:27,793
THE AMOUNT DEPENDS
ON THE TRAILER'S LENGTH.
232
00:14:27,793 --> 00:14:31,275
EACH AXLE CAN SUPPORT
AROUND TWO AND A HALF TONS.
233
00:14:34,965 --> 00:14:38,137
AFTER WORKERS INSTALL
ALL OF THE EXTERIOR PLYWOOD,
234
00:14:38,137 --> 00:14:41,206
WORKERS BEGIN
THE FINISHING PROCESS.
235
00:14:41,206 --> 00:14:43,413
AT THE TOP AND BOTTOM
OF THE TRAILER,
236
00:14:43,413 --> 00:14:48,068
THEY INSTALL STARTER MOLDINGS
MADE OF PAINTED SHEET STEEL.
237
00:14:48,068 --> 00:14:51,448
THEN THEY BEGIN INSTALLING
PANELS OF PAINTED STEEL.
238
00:14:58,034 --> 00:15:00,275
WINDOWS AND DOORS ARE INSTALLED
239
00:15:00,275 --> 00:15:03,103
BEFORE ADDING
THE PAINTED STEEL SIDING.
240
00:15:03,103 --> 00:15:05,137
THIS IS SO THE ENDS
OF THE STEEL SIDING
241
00:15:05,137 --> 00:15:07,413
WILL BENEATH THE DOOR
OR WINDOW MOLDINGS,
242
00:15:07,413 --> 00:15:09,551
PRODUCING A NEATER FINISH.
243
00:15:19,620 --> 00:15:22,068
TRAILERS LONGER THAN 32 FEET
244
00:15:22,068 --> 00:15:24,068
HAVE BOTH HEATING
AND AIR CONDITIONING
245
00:15:24,068 --> 00:15:27,379
VIA A DUCT SYSTEM.
246
00:15:27,379 --> 00:15:30,896
WORKERS MOUNT THE AIR DUCTS
TO THE CEILING WITH BRACKETS.
247
00:15:30,896 --> 00:15:33,275
THEY ALSO INSTALL
ELECTRICAL OUTLETS,
248
00:15:33,275 --> 00:15:35,241
LIGHT FIXTURES, INTERIOR TRIMS,
249
00:15:35,241 --> 00:15:38,310
AND ELECTRIC BASEBOARDS
FOR ADDITIONAL HEATING.
250
00:15:38,310 --> 00:15:40,482
TRAILERS SHORTER THAN 32 FEET
251
00:15:40,482 --> 00:15:42,482
ONLY HAVE
ELECTRIC BASEBOARD HEATERS
252
00:15:42,482 --> 00:15:44,413
AND A WINDOW-MOUNTED
AIR CONDITIONER.
253
00:15:44,413 --> 00:15:47,000
HOWEVER,
THERE IS THE OPTION TO UPGRADE
254
00:15:47,000 --> 00:15:48,931
TO THE FULL DUCT SYSTEM.
255
00:15:48,931 --> 00:15:50,241
TO FINISH THE ROOF,
256
00:15:50,241 --> 00:15:55,068
THEY STAPLE WHITE FIBERBOARD
TO THE ROOF JOISTS.
257
00:15:55,068 --> 00:15:57,620
THEN A HITCH SYSTEM
IS INSTALLED.
258
00:15:57,620 --> 00:15:59,862
THIS ENABLES A TRUCK
TO HAUL THE TRAILER
259
00:15:59,862 --> 00:16:02,896
TO AND FROM
THE CONSTRUCTION SITE.
260
00:16:14,517 --> 00:16:15,896
Narrator:
A METALWORKING VISE
261
00:16:15,896 --> 00:16:18,034
HOLDS A PIECE OF METAL IN PLACE
262
00:16:18,034 --> 00:16:21,517
SO THAT A COMPUTERIZED CUTTER
CAN SHAPE IT INTO A PART.
263
00:16:23,827 --> 00:16:27,068
YOU OFTEN SEE VISES
ON "HOW IT'S MADE."
264
00:16:27,068 --> 00:16:30,172
NOW IT'S TIME TO FIND OUT
HOW THEY ARE MADE.
265
00:16:34,724 --> 00:16:37,206
METALWORKING VISES
HAVE PARALLEL JAWS
266
00:16:37,206 --> 00:16:39,862
THAT CLOSE TIGHTLY
AROUND A PIECE OF METAL.
267
00:16:43,517 --> 00:16:45,586
THEIR FIRM GRIP ALLOWS A PART
268
00:16:45,586 --> 00:16:48,172
TO BE MACHINED
WITH PINPOINT ACCURACY.
269
00:16:52,620 --> 00:16:56,827
TO MAKE A METALWORKING VISE,
THEY START WITH A STEEL ROD.
270
00:16:56,827 --> 00:17:00,724
IT SPINS IN A LATHE
AS TOOLS CARVE THREADS INTO IT.
271
00:17:00,724 --> 00:17:03,482
THE RESULT IS A LEAD SCREW
272
00:17:03,482 --> 00:17:07,275
THAT WILL BE USED TO OPEN
AND CLOSE THE JAWS OF THE VISE.
273
00:17:09,517 --> 00:17:14,103
NEXT, CUTTERS TRANSFORM A PIECE
OF ALUMINUM INTO A THUMB SCREW.
274
00:17:14,103 --> 00:17:17,068
THE THUMB SCREW IS USED
FOR TURNING THE LEAD SCREW.
275
00:17:17,068 --> 00:17:18,310
THE OUTSIDE OF THE SCREW
276
00:17:18,310 --> 00:17:21,206
IS GIVEN A NEURAL TEXTURE
FOR BETTER GRIPPING.
277
00:17:21,206 --> 00:17:23,862
THE FINAL TOOL
SHAVES THE ROUGHED-EDGE RIM
278
00:17:23,862 --> 00:17:26,827
OF THE SCREW TO MAKE
IT SMOOTHER TO THE TOUCH.
279
00:17:26,827 --> 00:17:30,241
THIS COMPLETES THE THUMB SCREW.
280
00:17:30,241 --> 00:17:33,034
NOW, AN AUTOMATED SAW
CUTS THE STEEL BAR
281
00:17:33,034 --> 00:17:34,896
INTO SMALLER PIECES.
282
00:17:34,896 --> 00:17:39,517
EACH PIECE WILL BE USED
TO MAKE THE BASE OF A VISE.
283
00:17:39,517 --> 00:17:42,965
NEXT, A CUTTER SCULPTS
THE OUTSIDE OF A BASE PIECE
284
00:17:42,965 --> 00:17:45,103
TO THE DESIRED PROFILE.
285
00:17:47,655 --> 00:17:51,689
ANOTHER TOOL CARVES A CHANNEL
IN THE CENTER OF THE BASE PIECE.
286
00:17:59,517 --> 00:18:01,931
THE CUTTING MACHINE
ALSO CREATES COMPONENTS
287
00:18:01,931 --> 00:18:04,000
FOR THE VISE'S SHUTTLE SYSTEM.
288
00:18:07,862 --> 00:18:10,034
THEN A MACHINE CUTS
THE REVERSE SIDE
289
00:18:10,034 --> 00:18:12,551
OF THE VISE BASE
FLAT AND SMOOTH.
290
00:18:16,758 --> 00:18:18,344
IT ALSO DRILLS HOLES
291
00:18:18,344 --> 00:18:20,586
FOR MOUNTING THE VISE
TO MILLING EQUIPMENT.
292
00:18:23,206 --> 00:18:26,103
A CONSTANT FLOW
OF COOLANT IS APPLIED
293
00:18:26,103 --> 00:18:29,551
TO PROTECT THE TOOL FROM WEAR.
294
00:18:29,551 --> 00:18:32,896
NEXT, A STEEL BLOCK
IS LOCKED IN A VISE.
295
00:18:32,896 --> 00:18:36,275
YES, THEY USED VISES
TO MAKE NEW VISES.
296
00:18:39,724 --> 00:18:43,172
THE VISE HOLDS THE PIECE
OF STEEL FIRMLY IN PLACE
297
00:18:43,172 --> 00:18:46,931
AS TOOLS SHAPE IT
INTO ONE OF THE NEW VISE'S JAWS.
298
00:18:50,689 --> 00:18:52,482
AFTER A HEAT TREATMENT,
299
00:18:52,482 --> 00:18:54,413
THEY SPRAY
SMALL PARTICLES OF SAND
300
00:18:54,413 --> 00:18:57,482
ONTO THE NEWLY FORMED JAW.
301
00:18:57,482 --> 00:19:00,344
THE SAND BLASTING
REMOVES BLEMISHES.
302
00:19:03,620 --> 00:19:06,448
A WORKER NOW SUBMERGES
ALL PARTS OF THE VISE
303
00:19:06,448 --> 00:19:08,206
IN A HOT CHEMICAL SOLUTION,
304
00:19:08,206 --> 00:19:11,758
LEAVING THEM THERE
FOR EIGHT HOURS.
305
00:19:11,758 --> 00:19:15,724
THIS CHEMICAL SOLUTION GIVES
THE PARTS A BLACK OXIDE FINISH
306
00:19:15,724 --> 00:19:18,000
AND PROTECTS THEM FROM RUST.
307
00:19:20,896 --> 00:19:25,620
HERE IS THE VISE BEFORE
AND AFTER THE OXIDE TREATMENT.
308
00:19:25,620 --> 00:19:27,275
NEXT,
309
00:19:27,275 --> 00:19:29,241
A LASER ETCHES THE BRAND NAME,
310
00:19:29,241 --> 00:19:31,137
PART NUMBER,
AND BASIC DIMENSIONS
311
00:19:31,137 --> 00:19:33,137
ONTO THE BASE OF THE VISE.
312
00:19:39,000 --> 00:19:42,586
THEN A PROBE GAUGES THE SIZE
OF THE MOUNTING HOLE.
313
00:19:42,586 --> 00:19:43,793
IT ALSO DETERMINES
314
00:19:43,793 --> 00:19:47,689
IF THEY'VE BEEN DRILLED
IN THE CORRECT LOCATION.
315
00:19:47,689 --> 00:19:49,931
NOW, IT'S TIME
TO ASSEMBLE ALL THE PARTS
316
00:19:49,931 --> 00:19:53,103
OF THE METALWORKING VISE.
317
00:19:53,103 --> 00:19:56,827
THE WORKER THREADS RETAINER
RINGS ONTO THE LEAD SCREW.
318
00:19:56,827 --> 00:19:59,931
THEN HE INSTALLS THE LEAD SCREW
IN THE BASE.
319
00:20:02,758 --> 00:20:06,758
HE PLACES SHUTTLE DEVICES
ONTO EACH END OF THE LEAD SCREW.
320
00:20:11,103 --> 00:20:14,655
HE INSERTS SPACING BLOCKS
IN THE CHANNEL.
321
00:20:14,655 --> 00:20:17,103
HE MOVES THE SHUTTLE DEVICES
FORWARD,
322
00:20:17,103 --> 00:20:19,413
USING THE SPACING BLOCKS
AS GUIDES
323
00:20:19,413 --> 00:20:22,344
FOR THE CORRECT POSITIONING.
324
00:20:22,344 --> 00:20:24,827
AFTER REMOVING
THE SPACING BLOCKS,
325
00:20:24,827 --> 00:20:27,379
HE ADJUSTS THE RETAINER RINGS.
326
00:20:29,862 --> 00:20:32,586
HE PLACES STEEL JAWS
ON THE SHUTTLE DEVICES
327
00:20:32,586 --> 00:20:34,689
AND BOLTS THEM IN PLACE.
328
00:20:38,137 --> 00:20:41,206
ONCE THE THUMB SCREW HAS BEEN
ATTACHED TO THE LEAD SCREW,
329
00:20:41,206 --> 00:20:44,689
THE ASSEMBLY IS COMPLETE.
330
00:20:44,689 --> 00:20:48,448
NOW, IT'S OVER TO A COMPUTERIZED
MEASURING STATION.
331
00:20:48,448 --> 00:20:51,034
THE CONTROLLER POSITIONS
THE VISE IN THE EQUIPMENT,
332
00:20:51,034 --> 00:20:54,137
THEN A PROBE MOVES IN.
333
00:20:54,137 --> 00:20:57,034
THE PROBE COMPARES
THE COORDINATES OF THE VISE
334
00:20:57,034 --> 00:20:58,379
TO A COMPUTER MODEL
335
00:20:58,379 --> 00:21:01,275
AND CHECKS THAT IT MEASURES UP
TO STANDARDS.
336
00:21:03,827 --> 00:21:07,068
METALWORKING VISES
TAKE FOUR WEEKS TO MAKE
337
00:21:07,068 --> 00:21:09,793
AND WILL HOLD UP FOR MANY YEARS.
338
00:21:17,689 --> 00:21:21,137
IF YOU HAVE ANY COMMENTS
ABOUT THE SHOW,
339
00:21:21,137 --> 00:21:24,103
OR IF YOU'D LIKE TO SUGGEST
TOPICS FOR FUTURE SHOWS,
340
00:21:24,103 --> 00:21:27,172
DROP US A LINE AT...
26971
Can't find what you're looking for?
Get subtitles in any language from opensubtitles.com, and translate them here.