All language subtitles for S22E10 - Motorcycle Sidecars; Frozen French Toast; Refrigerator Compressors; Superchargers (1080p AMZN WEB-DL x265 Garshasp)_track3_[eng]
Would you like to inspect the original subtitles? These are the user uploaded subtitles that are being translated:
1
00:00:01,655 --> 00:00:04,655
--captions by vitac--
Www.Vitac.Com
2
00:00:04,655 --> 00:00:07,655
Captions paid for by
Discovery communications
3
00:00:52,896 --> 00:00:55,965
Narrator: a sidecar
Is a passenger attachment
4
00:00:55,965 --> 00:00:57,827
That bolts to a motorcycle.
5
00:00:57,827 --> 00:01:01,068
Sidecars
Are aftermarket products,
6
00:01:01,068 --> 00:01:03,793
Meaning a separate company --
Not the motorcycle maker --
7
00:01:03,793 --> 00:01:06,068
Manufactures and markets them.
8
00:01:07,931 --> 00:01:11,068
You buy a model that's
Compatible with your motorcycle.
9
00:01:14,586 --> 00:01:18,172
A motorcycle sidecar carries
One passenger or two,
10
00:01:18,172 --> 00:01:20,793
If they're small children
Or pets.
11
00:01:20,793 --> 00:01:23,793
Manufacturers typically produce
Several models,
12
00:01:23,793 --> 00:01:27,103
Designed to fit the most popular
Bikes on the market.
13
00:01:27,103 --> 00:01:30,000
This one has a fiberglass body,
14
00:01:30,000 --> 00:01:33,000
Surrounded by a steel
Perimeter chassis.
15
00:01:33,000 --> 00:01:35,137
Workers construct the chassis
16
00:01:35,137 --> 00:01:38,172
Using several sections
Of steel tubing.
17
00:01:38,172 --> 00:01:39,379
They form each section
18
00:01:39,379 --> 00:01:41,517
To the required shape
On a hydraulic bender,
19
00:01:41,517 --> 00:01:44,034
Measuring as they go.
20
00:01:44,034 --> 00:01:46,344
There are sections
In the front and back,
21
00:01:46,344 --> 00:01:48,344
Along the sides, and underneath.
22
00:01:52,689 --> 00:01:56,482
Once the sections are each bent
To specifications,
23
00:01:56,482 --> 00:01:58,724
Workers clamp them into a jig,
24
00:01:58,724 --> 00:02:02,206
Which aligns them all
In the correct configuration.
25
00:02:02,206 --> 00:02:04,137
The smaller-diameter sections
26
00:02:04,137 --> 00:02:06,620
Fit into adjoining
Larger-diameter ones.
27
00:02:12,034 --> 00:02:16,344
Once all the parts are in
Position, a welder fuses them.
28
00:02:16,344 --> 00:02:19,206
The structure of the perimeter
Chassis is now complete
29
00:02:19,206 --> 00:02:21,689
And ready for a coat
Of baked-on powder paint
30
00:02:21,689 --> 00:02:23,689
To prevent the steel
From rusting.
31
00:02:25,241 --> 00:02:27,724
Next, workers mount
The suspension
32
00:02:27,724 --> 00:02:29,482
And wheel to the chassis,
33
00:02:29,482 --> 00:02:32,482
Then install
A fiberglass mudguard
34
00:02:32,482 --> 00:02:36,965
That has a reflector,
A taillight, and a turn signal.
35
00:02:36,965 --> 00:02:39,655
They make the sidecar's
Fiberglass body
36
00:02:39,655 --> 00:02:41,448
With upper and lower molds,
37
00:02:41,448 --> 00:02:43,517
First painting each one
With gel coat,
38
00:02:43,517 --> 00:02:44,896
A polyester resin
39
00:02:44,896 --> 00:02:49,241
That creates a smooth and shiny
Surface over fiberglass.
40
00:02:49,241 --> 00:02:52,965
When the gel coat dries,
About 45 minutes later,
41
00:02:52,965 --> 00:02:55,379
They lay fiberglass mat over it,
42
00:02:55,379 --> 00:02:57,896
Then saturate the fiberglass
With resin.
43
00:02:57,896 --> 00:03:01,206
They lay two fiberglass layers
In most parts of the mold
44
00:03:01,206 --> 00:03:04,827
And a few extra layers in areas
That need a bit more strength
45
00:03:04,827 --> 00:03:07,000
To support attached components.
46
00:03:07,000 --> 00:03:09,103
In the lower mold,
47
00:03:09,103 --> 00:03:11,689
They re-enforce the floor
With plywood
48
00:03:11,689 --> 00:03:15,275
And, in specific locations,
Bond in steel mounting plates
49
00:03:15,275 --> 00:03:18,862
For bolting components
To the fiberglass later on.
50
00:03:18,862 --> 00:03:23,206
24 hours later,
Once the resin has cured,
51
00:03:23,206 --> 00:03:25,827
They extract the upper-
And lower-body halves
52
00:03:25,827 --> 00:03:28,655
From their respective molds,
Trim the rough edges,
53
00:03:28,655 --> 00:03:30,862
And join the halves
On the inside
54
00:03:30,862 --> 00:03:32,793
With more fiberglass and resin.
55
00:03:32,793 --> 00:03:35,310
Then they place
The now-assembled body
56
00:03:35,310 --> 00:03:38,655
Inside the perimeter chassis
To check the alignment.
57
00:03:38,655 --> 00:03:41,689
But they don't connect
The chassis just yet.
58
00:03:41,689 --> 00:03:45,172
First, to snazz up the body,
They mount a nose badge
59
00:03:45,172 --> 00:03:48,275
Made of stainless steel
And anodized aluminum.
60
00:03:50,172 --> 00:03:53,689
Then they attach aluminum strips
To the nose badge,
61
00:03:53,689 --> 00:03:56,793
Affixing them to the fiberglass
With rivets.
62
00:03:59,724 --> 00:04:02,206
They gently tap the strips
With a mallet,
63
00:04:02,206 --> 00:04:04,586
Shaping them to the contour
Of the body.
64
00:04:09,379 --> 00:04:13,034
Then they set a rubber insert
Into each strip.
65
00:04:17,379 --> 00:04:20,827
This adds a decorative touch,
While hiding the rivets.
66
00:04:30,517 --> 00:04:33,310
Next, the sidecar's windscreen.
67
00:04:33,310 --> 00:04:35,413
It's made of polycarbonate,
68
00:04:35,413 --> 00:04:38,724
An ultra-thin yet strong type
Of plastic,
69
00:04:38,724 --> 00:04:41,586
Encased in a durable
Aluminum frame.
70
00:04:45,137 --> 00:04:48,793
They finish off the body
By installing carpeting
71
00:04:48,793 --> 00:04:50,620
And an upholstered vinyl seat.
72
00:04:53,379 --> 00:04:55,241
Workers position the sidecar
73
00:04:55,241 --> 00:04:58,241
So that its wheel
Is turned slightly inward.
74
00:04:58,241 --> 00:05:03,310
This ensures the bike
And sidecar handle correctly.
75
00:05:03,310 --> 00:05:05,689
Then they bolt the chassis
To the bike frame
76
00:05:05,689 --> 00:05:07,068
With four steel arms --
77
00:05:07,068 --> 00:05:09,413
Two at the front
And two at the back.
78
00:05:09,413 --> 00:05:11,965
Next they fit a steering damper.
79
00:05:11,965 --> 00:05:14,034
This prevents the sidecar
80
00:05:14,034 --> 00:05:17,379
From causing a wobble
In the steering.
81
00:05:17,379 --> 00:05:19,758
The final step is to connect
The electrical wiring
82
00:05:19,758 --> 00:05:21,655
To the lights and the mudguard.
83
00:05:23,172 --> 00:05:26,655
The perimeter chassis is now
Ready to receive the body.
84
00:05:30,275 --> 00:05:33,034
They thread bolts into the holes
Of those mounting plates
85
00:05:33,034 --> 00:05:34,965
That were bonded in
With the fiberglass
86
00:05:34,965 --> 00:05:36,827
During the molding process --
87
00:05:36,827 --> 00:05:40,655
Two bolts at the front and two
At the back, through the floor.
88
00:05:42,862 --> 00:05:45,448
With that,
This motorcycle sidecar
89
00:05:45,448 --> 00:05:47,206
Is ready to hit the road.
90
00:06:02,034 --> 00:06:03,793
Narrator: love french toast
For breakfast
91
00:06:03,793 --> 00:06:05,344
But don't have the time
Or patience
92
00:06:05,344 --> 00:06:06,896
To make it from scratch?
93
00:06:06,896 --> 00:06:09,965
That's why there's ready-made
Frozen french toast
94
00:06:09,965 --> 00:06:12,689
That you simply pop
Into the toaster --
95
00:06:12,689 --> 00:06:16,896
No cracking eggs, pouring milk,
Or dipping bread required.
96
00:06:16,896 --> 00:06:19,517
Just pour on the syrup
And enjoy.
97
00:06:22,517 --> 00:06:25,000
A breakfast favorite
For generations,
98
00:06:25,000 --> 00:06:28,068
It's easy to get sentimental
About french toast.
99
00:06:28,068 --> 00:06:31,482
To get that traditional taste
Without the traditional mess,
100
00:06:31,482 --> 00:06:33,172
There's frozen french toast.
101
00:06:33,172 --> 00:06:36,241
They go from your freezer
To your breakfast table
102
00:06:36,241 --> 00:06:37,379
In just minutes.
103
00:06:39,586 --> 00:06:43,655
French toast starts
With freshly baked bread.
104
00:06:43,655 --> 00:06:46,517
A local bakery supplies
This factory
105
00:06:46,517 --> 00:06:49,448
With custom-made
16-inch-long loaves.
106
00:06:57,482 --> 00:07:00,103
When those
Fresh-baked loaves arrive,
107
00:07:00,103 --> 00:07:03,620
Workers load them horizontally
Onto a conveyor belt.
108
00:07:03,620 --> 00:07:06,137
The belt winds its way
To the first machine
109
00:07:06,137 --> 00:07:08,379
On the production line --
The slicer.
110
00:07:08,379 --> 00:07:11,103
The slicer has several
Vertical blades,
111
00:07:11,103 --> 00:07:14,793
Crossed in a figure eight
Over two drums that drive them.
112
00:07:14,793 --> 00:07:19,034
Because each blade crisscrosses,
It cuts two slices at once.
113
00:07:21,965 --> 00:07:23,931
For this production run,
114
00:07:23,931 --> 00:07:27,137
The slicer cuts each loaf
Into 28 slices
115
00:07:27,137 --> 00:07:29,241
Almost half an inch thick.
116
00:07:34,275 --> 00:07:36,862
At the output end of the slicer,
117
00:07:36,862 --> 00:07:39,896
Workers discard
The two end pieces.
118
00:07:39,896 --> 00:07:42,482
However, these heels, as
They're called, aren't wasted.
119
00:07:42,482 --> 00:07:44,827
They're used for animal feed.
120
00:07:46,862 --> 00:07:51,551
Workers load the cut loaves into
Side-by-side vertical columns.
121
00:07:55,551 --> 00:07:59,275
The slices drop down
Onto a wire conveyor belt.
122
00:07:59,275 --> 00:08:03,068
The spacing between rows and
Slices is perfectly positioned
123
00:08:03,068 --> 00:08:05,586
To align
With the upcoming stations,
124
00:08:05,586 --> 00:08:09,000
Which will transform them from
Bread to frozen french toast.
125
00:08:16,172 --> 00:08:19,827
First, the slicer enters
The batter station,
126
00:08:19,827 --> 00:08:22,137
Which bathes their underside
127
00:08:22,137 --> 00:08:25,862
In a mixture of eggs, milk,
Water, and sugar.
128
00:08:29,689 --> 00:08:32,655
The slices then pass
Under a batter waterfall,
129
00:08:32,655 --> 00:08:35,310
Which thoroughly coats
Their top surface.
130
00:08:42,862 --> 00:08:46,482
The slices exit the batter
Station onto a wire belt,
131
00:08:46,482 --> 00:08:49,827
Which feeds them
Onto cast-iron griddle plates.
132
00:08:52,586 --> 00:08:55,931
Gas flames underneath
Heat the plates
133
00:08:55,931 --> 00:08:58,206
To 275 degrees fahrenheit.
134
00:08:58,206 --> 00:09:01,724
After several seconds,
The underside is cooked,
135
00:09:01,724 --> 00:09:06,172
And a row of automated spatulas,
Appropriately called flippers,
136
00:09:06,172 --> 00:09:10,000
Turns the slices over
To cook the reverse side.
137
00:09:15,586 --> 00:09:18,517
Seconds later, the fully cooked
French toast slices
138
00:09:18,517 --> 00:09:20,896
Are removed
From the griddle plates...
139
00:09:23,896 --> 00:09:27,310
...And deposited
Onto a conveyor belt.
140
00:09:33,310 --> 00:09:35,310
All of the single-file conveyors
141
00:09:35,310 --> 00:09:37,896
Now converge on a larger
Conveyor belt,
142
00:09:37,896 --> 00:09:41,551
Which transports the slices
Into the freezer.
143
00:09:41,551 --> 00:09:45,344
The temperature inside --
Negative 4 degrees fahrenheit.
144
00:09:45,344 --> 00:09:48,172
After a frosty 23-minute ride,
145
00:09:48,172 --> 00:09:51,931
The french toast
Is completely frozen.
146
00:09:51,931 --> 00:09:53,827
It exits the freezer,
147
00:09:53,827 --> 00:09:57,586
Ready to be sorted
Into packaging portions.
148
00:09:57,586 --> 00:10:02,172
For this order, workers stack
The slices in fours.
149
00:10:02,172 --> 00:10:04,896
Each package
Will contain two stacks.
150
00:10:10,137 --> 00:10:13,482
The packaging machine
Inserts each portion
151
00:10:13,482 --> 00:10:16,517
Into a continuous
Plastic-film pouch.
152
00:10:22,724 --> 00:10:24,793
Then, at both ends
Of each portion,
153
00:10:24,793 --> 00:10:27,724
It simultaneously
Heat-seals the film
154
00:10:27,724 --> 00:10:29,620
And cuts the pouch free.
155
00:10:31,827 --> 00:10:35,275
An automated arm picks up
Each pouch and inserts it,
156
00:10:35,275 --> 00:10:39,103
Either into small retail cartons
Destined for supermarkets
157
00:10:39,103 --> 00:10:44,379
Or into large boxes
For bulk orders to cafeterias,
158
00:10:44,379 --> 00:10:46,931
Hospital kitchens,
And restaurants.
159
00:10:46,931 --> 00:10:49,758
All packaging, warehousing,
And shipping
160
00:10:49,758 --> 00:10:52,448
Occurs in temperature-controlled
Facilities
161
00:10:52,448 --> 00:10:54,551
To keep the product frozen
162
00:10:54,551 --> 00:10:58,172
Until it's time to toast
This breakfast tradition.
163
00:11:10,000 --> 00:11:12,448
Narrator: behind every chilled
Beverage, there's a compressor,
164
00:11:12,448 --> 00:11:15,965
A crucial component
In refrigeration systems.
165
00:11:15,965 --> 00:11:19,068
It pressurizes and pumps
Refrigerant to the condenser
166
00:11:19,068 --> 00:11:21,206
So the cooling process
Can begin.
167
00:11:21,206 --> 00:11:23,448
With a well-functioning
Compressor,
168
00:11:23,448 --> 00:11:27,034
A refrigerator is more likely
To keep its cool.
169
00:11:30,172 --> 00:11:34,068
Behind the glossy exterior
Of a supermarket refrigerator,
170
00:11:34,068 --> 00:11:37,379
There's a substantial compressor
Doing its part
171
00:11:37,379 --> 00:11:39,137
To chill the merchandise.
172
00:11:39,137 --> 00:11:41,896
They often remanufacture
Old compressors
173
00:11:41,896 --> 00:11:43,793
To save resources and money.
174
00:11:43,793 --> 00:11:47,137
They immerse the cast-iron body
In a chemical bath
175
00:11:47,137 --> 00:11:50,793
To remove the grime and rinse
Off the residue with hot water.
176
00:11:50,793 --> 00:11:55,896
That old compressor already
Looks a lot less tired.
177
00:11:55,896 --> 00:12:00,000
A worker polishes the cylinder
Bore with an abrasive pad
178
00:12:00,000 --> 00:12:02,000
Attached to an air drill.
179
00:12:02,000 --> 00:12:04,862
He sands the surfaces
Around the openings
180
00:12:04,862 --> 00:12:08,068
So that all the parts will fit
Without leaking.
181
00:12:08,068 --> 00:12:11,241
Smaller parts bounce around
In a vibratory bowl
182
00:12:11,241 --> 00:12:15,137
With steel pellets and cleaning
Compound for a good scouring.
183
00:12:15,137 --> 00:12:18,689
Out of the bowl, a worker places
A valve plate
184
00:12:18,689 --> 00:12:22,517
On a magnetized turntable
To keep it in one place,
185
00:12:22,517 --> 00:12:25,275
As a grinder
Smoothes the surface.
186
00:12:25,275 --> 00:12:26,896
This makes it look new.
187
00:12:31,034 --> 00:12:33,827
He screws two new valves
To the plate.
188
00:12:33,827 --> 00:12:36,068
These valves will open and close
189
00:12:36,068 --> 00:12:38,724
To move refrigerant in and out
Of the compressor.
190
00:12:48,137 --> 00:12:50,620
The next worker assembles
The terminal plate
191
00:12:50,620 --> 00:12:52,793
For the compressor's
Electrical motor.
192
00:12:52,793 --> 00:12:55,931
Most of the components
Have been reconditioned,
193
00:12:55,931 --> 00:12:58,275
Including the lugs
For the wires.
194
00:12:58,275 --> 00:13:02,482
He slots the lugs in the
Terminal plate from the back
195
00:13:02,482 --> 00:13:06,896
And flips the plate around.
196
00:13:06,896 --> 00:13:10,620
He slides new rubber seals
Onto all the lugs...
197
00:13:13,172 --> 00:13:16,896
...And then installs rubber
Insulators and metal washers.
198
00:13:16,896 --> 00:13:20,551
He secures the lugs with screws,
199
00:13:20,551 --> 00:13:23,482
Using a precisely calibrated
Torque wrench.
200
00:13:30,413 --> 00:13:32,241
The compressor's
Original crankshaft
201
00:13:32,241 --> 00:13:33,965
Has also been
Thoroughly cleaned.
202
00:13:33,965 --> 00:13:36,862
As it now spins in a chuck,
203
00:13:36,862 --> 00:13:39,931
A worker polishes it
Until it's completely smooth.
204
00:13:39,931 --> 00:13:42,689
This will allow bearings
And connecting rods
205
00:13:42,689 --> 00:13:44,137
To operate efficiently.
206
00:13:47,137 --> 00:13:50,586
He measures the shaft to confirm
That the circumference is right.
207
00:13:53,448 --> 00:13:55,413
With many parts
Now reconditioned
208
00:13:55,413 --> 00:13:56,758
And partially assembled,
209
00:13:56,758 --> 00:14:00,344
They're ready to reconstruct
The compressor.
210
00:14:00,344 --> 00:14:05,000
The worker installs new bearings
And the refurbished crankshaft
211
00:14:05,000 --> 00:14:06,965
Into the compressor body.
212
00:14:06,965 --> 00:14:11,034
He inserts the connecting-rod
And piston assemblies.
213
00:14:11,034 --> 00:14:12,689
Moved by the crankshaft,
214
00:14:12,689 --> 00:14:15,862
These pistons will compress
The refrigerant gas
215
00:14:15,862 --> 00:14:20,137
To pump it through the system.
216
00:14:20,137 --> 00:14:23,931
He slides the rotor part of
The motor into the compressor,
217
00:14:23,931 --> 00:14:26,344
And it links up
To the crankshaft.
218
00:14:26,344 --> 00:14:30,241
He aligns the rotor to
The crankshaft with a long pin.
219
00:14:30,241 --> 00:14:34,413
He secures the rotor to the hub
With a substantial bolt.
220
00:14:34,413 --> 00:14:37,586
The next part is the stator.
221
00:14:37,586 --> 00:14:40,137
It's the magnetized mechanism
222
00:14:40,137 --> 00:14:43,862
That drives the rotor and,
Subsequently, the crankshaft.
223
00:14:49,862 --> 00:14:53,241
He connects protruding wires to
The lugs on the terminal board
224
00:14:53,241 --> 00:14:54,793
We saw reassembled earlier.
225
00:14:59,275 --> 00:15:01,724
He sets the terminal board flush
To the compressor
226
00:15:01,724 --> 00:15:02,724
And bolts it to it.
227
00:15:05,862 --> 00:15:09,068
He fits the valve plate
On the cylinders,
228
00:15:09,068 --> 00:15:11,413
Adjacent to the terminal plate.
229
00:15:15,034 --> 00:15:17,827
He places the cylinder head
Over the valve plate
230
00:15:17,827 --> 00:15:19,103
And bolts it to it.
231
00:15:19,103 --> 00:15:23,275
The remanufacture
Of this compressor is complete.
232
00:15:25,689 --> 00:15:31,862
To test the compressor, they
Pump dry nitrogen through it.
233
00:15:31,862 --> 00:15:35,000
A machine measures the suction
And discharge pressure,
234
00:15:35,000 --> 00:15:36,862
As well as the electrical draw.
235
00:15:38,689 --> 00:15:41,068
And still running dry nitrogen
Through it,
236
00:15:41,068 --> 00:15:43,241
They immerse the compressor
In water
237
00:15:43,241 --> 00:15:45,931
And check for bubbles
That would indicate leaks.
238
00:15:47,896 --> 00:15:49,827
They make repairs if needed
239
00:15:49,827 --> 00:15:53,103
And then spray the compressor
With enamel paint
240
00:15:53,103 --> 00:15:54,827
To protect it from rust.
241
00:15:54,827 --> 00:15:57,965
Remanufacturing this
Refrigeration compressor
242
00:15:57,965 --> 00:15:59,379
Has taken 24 hours.
243
00:15:59,379 --> 00:16:02,655
It's given it a whole new lease
On life.
244
00:16:17,034 --> 00:16:18,206
Narrator: an engine
245
00:16:18,206 --> 00:16:20,482
Naturally takes in air
From the atmosphere
246
00:16:20,482 --> 00:16:22,034
To burn the fuel with oxygen.
247
00:16:22,034 --> 00:16:24,724
If you're looking to give
Your car a boost,
248
00:16:24,724 --> 00:16:26,482
A supercharger compresses air
249
00:16:26,482 --> 00:16:28,758
And force-feeds it
Into the engine.
250
00:16:28,758 --> 00:16:31,965
The increased mass of oxygen
Burns more fuel,
251
00:16:31,965 --> 00:16:34,000
Giving the engine more power.
252
00:16:37,379 --> 00:16:41,310
A supercharger is particularly
Popular in drag-car racing.
253
00:16:41,310 --> 00:16:44,793
It attaches with a belt
To the engine's crankshaft,
254
00:16:44,793 --> 00:16:47,310
And, voilà, the car's
On steroids.
255
00:16:47,310 --> 00:16:48,965
They begin with a plate
256
00:16:48,965 --> 00:16:52,103
That forms the rear of the
Supercharger's aluminum housing.
257
00:16:52,103 --> 00:16:56,000
Using a press that applies
Several tons of pressure,
258
00:16:56,000 --> 00:16:58,517
They install
Two steel ball bearings.
259
00:16:58,517 --> 00:16:59,724
These will enable
260
00:16:59,724 --> 00:17:02,344
The supercharger's two rotors
To spin,
261
00:17:02,344 --> 00:17:05,448
Which is what compresses air
And forces it into the engine.
262
00:17:07,793 --> 00:17:10,655
After bolting the steel cap
Over each bearing,
263
00:17:10,655 --> 00:17:13,068
Workers insert steel dowels
Into holes
264
00:17:13,068 --> 00:17:15,310
Along the perimeter
Of the plate.
265
00:17:15,310 --> 00:17:18,827
These dowels, which they now
Fully seat with the press,
266
00:17:18,827 --> 00:17:22,517
Will align with receiving holes
On the adjoining housings.
267
00:17:25,862 --> 00:17:29,413
They take the plate that forms
The front end of the housing
268
00:17:29,413 --> 00:17:31,931
And press a steel ball bearing
Into it.
269
00:17:31,931 --> 00:17:36,241
This bearing will enable
The supercharger's input shaft
270
00:17:36,241 --> 00:17:39,862
To rotate and, by doing so,
Spin the rotors.
271
00:17:39,862 --> 00:17:43,793
They press a rubber-lip seal
On top of the bearing
272
00:17:43,793 --> 00:17:46,000
To keep oil in and dirt out.
273
00:17:51,758 --> 00:17:54,344
Next, they apply
A retaining clip
274
00:17:54,344 --> 00:17:56,448
To hold the seal in position.
275
00:18:02,000 --> 00:18:05,310
Using the press, they seat
The clip in its groove.
276
00:18:08,517 --> 00:18:11,413
Next, they insert
The input shaft.
277
00:18:11,413 --> 00:18:15,655
Its flanged end will protrude
Out of the supercharger,
278
00:18:15,655 --> 00:18:17,655
Where a belt and pulley
Will rotate it
279
00:18:17,655 --> 00:18:20,000
So that it turns gears
Which spin the rotors.
280
00:18:23,793 --> 00:18:25,413
A computer-guided mill
281
00:18:25,413 --> 00:18:28,586
Machines each rotor out
Of extruded aluminum.
282
00:18:38,724 --> 00:18:40,448
Once both rotors are ready,
283
00:18:40,448 --> 00:18:44,137
Workers take the central section
Of the supercharger housing
284
00:18:44,137 --> 00:18:46,517
And apply sealant
To one end of it.
285
00:18:54,000 --> 00:18:55,655
They affix the rear plate
286
00:18:55,655 --> 00:18:59,000
Containing the two bearings
For the rotors.
287
00:19:02,931 --> 00:19:05,620
They secure the plate
To the main housing
288
00:19:05,620 --> 00:19:07,344
Using socket-headed screws,
289
00:19:07,344 --> 00:19:09,310
Which they tighten
With an air driver.
290
00:19:11,896 --> 00:19:14,413
Flipping the housing
To the other side now,
291
00:19:14,413 --> 00:19:16,862
They install the first
Of the two rotors,
292
00:19:16,862 --> 00:19:19,344
Inserting its shaft
Into the first bearing
293
00:19:19,344 --> 00:19:22,137
In the just-attached rear plate.
294
00:19:22,137 --> 00:19:24,482
Then they install
The second rotor,
295
00:19:24,482 --> 00:19:28,275
Inserting its shaft into
The second bearing in the plate.
296
00:19:28,275 --> 00:19:31,586
The second rotor lies
Perpendicular to the first.
297
00:19:31,586 --> 00:19:34,275
This positioning allows
The spinning rotors
298
00:19:34,275 --> 00:19:37,517
To capture air at the top
Of the housing, compress it,
299
00:19:37,517 --> 00:19:40,620
And force it downward
To the bottom of the housing.
300
00:19:40,620 --> 00:19:43,586
They close up the housing
With another plate
301
00:19:43,586 --> 00:19:46,931
Which also contains bearings
For the rotor shafts.
302
00:19:46,931 --> 00:19:50,827
However, on this end, the shafts
Protrude beyond the bearings
303
00:19:50,827 --> 00:19:54,344
In order to receive gears.
304
00:19:54,344 --> 00:19:56,586
Then to this, they'll attach
The housing
305
00:19:56,586 --> 00:19:58,034
Containing the input shaft,
306
00:19:58,034 --> 00:20:00,448
Which, driven by the belt
And pulley,
307
00:20:00,448 --> 00:20:03,000
Rotates these gears
To spin the rotors.
308
00:20:05,000 --> 00:20:06,793
Before continuing further,
309
00:20:06,793 --> 00:20:10,586
The team puts the supercharger
Through a performance test.
310
00:20:10,586 --> 00:20:12,344
The machine,
Called a dynamometer,
311
00:20:12,344 --> 00:20:15,172
Assesses the ratio of speed
To air flow
312
00:20:15,172 --> 00:20:18,068
To ensure the rotors
Are compressing air
313
00:20:18,068 --> 00:20:19,551
The way they should be
314
00:20:19,551 --> 00:20:22,379
And therefore outputting
The required boost.
315
00:20:22,379 --> 00:20:25,413
If the rotors pass the test
With flying colors,
316
00:20:25,413 --> 00:20:28,965
Workers then hand-polish
The aluminum housing
317
00:20:28,965 --> 00:20:30,482
To a shiny finish.
318
00:20:30,482 --> 00:20:33,206
A key component
In the supercharger
319
00:20:33,206 --> 00:20:34,793
Is a feeler gauge --
320
00:20:34,793 --> 00:20:37,758
That fan-shaped part
Shown on the lower left.
321
00:20:37,758 --> 00:20:41,448
It ensures that the distance
Between the rotors is correct,
322
00:20:41,448 --> 00:20:45,172
Which is critical, because if
The rotors are too far apart,
323
00:20:45,172 --> 00:20:47,551
They don't compress air
Adequately.
324
00:20:47,551 --> 00:20:50,137
And if they're too close
Together, they jam.
325
00:20:50,137 --> 00:20:53,275
It's the customer who, when
Installing the supercharger,
326
00:20:53,275 --> 00:20:56,655
Attaches a pulley to the end
Of the input shaft,
327
00:20:56,655 --> 00:20:58,586
Then a belt onto the pulley.
328
00:20:58,586 --> 00:20:59,965
The other end of the belt
329
00:20:59,965 --> 00:21:02,620
Loops around the car engine's
Crankshaft pulley,
330
00:21:02,620 --> 00:21:04,862
Connecting the supercharger
To the engine
331
00:21:04,862 --> 00:21:06,758
For a mega boost of power.
332
00:21:06,758 --> 00:21:09,137
[ engine revs ]
333
00:21:22,000 --> 00:21:24,413
If you have any comments
About the show,
334
00:21:24,413 --> 00:21:27,103
Or if you'd like to suggest
Topics for future shows,
335
00:21:27,103 --> 00:21:29,275
Drop us a line at...
27201
Can't find what you're looking for?
Get subtitles in any language from opensubtitles.com, and translate them here.