Afrikaans
Akan
Albanian
Amharic
Arabic
Armenian
Azerbaijani
Basque
Belarusian
Bemba
Bengali
Bihari
Bosnian
Breton
Bulgarian
Cambodian
Catalan
Cebuano
Cherokee
Chichewa
Chinese (Simplified)
Chinese (Traditional)
Corsican
Croatian
Czech
Danish
Dutch
English
Esperanto
Estonian
Ewe
Faroese
Filipino
Finnish
French
Frisian
Ga
Galician
Georgian
German
Greek
Guarani
Gujarati
Haitian Creole
Hausa
Hawaiian
Hebrew
Hindi
Hmong
Hungarian
Icelandic
Igbo
Indonesian
Interlingua
Irish
Italian
Japanese
Javanese
Kannada
Kazakh
Kinyarwanda
Kirundi
Kongo
Korean
Krio (Sierra Leone)
Kurdish
Kurdish (Soranî)
Kyrgyz
Laothian
Latin
Latvian
Lingala
Lithuanian
Lozi
Luganda
Luo
Luxembourgish
Macedonian
Malagasy
Malay
Malayalam
Maltese
Maori
Marathi
Mauritian Creole
Moldavian
Mongolian
Myanmar (Burmese)
Montenegrin
Nepali
Nigerian Pidgin
Northern Sotho
Norwegian
Norwegian (Nynorsk)
Occitan
Oriya
Oromo
Pashto
Polish
Portuguese (Brazil)
Portuguese (Portugal)
Punjabi
Quechua
Romanian
Romansh
Runyakitara
Russian
Samoan
Scots Gaelic
Serbian
Serbo-Croatian
Sesotho
Setswana
Seychellois Creole
Shona
Sindhi
Sinhalese
Slovak
Slovenian
Somali
Spanish
Spanish (Latin American)
Sundanese
Swahili
Swedish
Tajik
Tamil
Tatar
Telugu
Thai
Tigrinya
Tonga
Tshiluba
Tumbuka
Turkish
Turkmen
Twi
Uighur
Ukrainian
Urdu
Uzbek
Vietnamese
Welsh
Wolof
Xhosa
Yiddish
Yoruba
Zulu
1
- [Narrator] All right, let's talk about priorities.
2
So we just talked about composites,
3
which really powerful, super useful attributes.
4
But within a building material,
5
we have different sets of priorities.
6
And so each of these elements
7
are represented as building materials.
8
And so what priorities are,
9
so if we look at this,
10
so this edge condition is showing us a couple things.
11
Right now, what I'm seeing is I'm seeing a wood floor,
12
diving in to a gyp wall.
13
And if I wanted to make an adjustment
14
to how that is reflected,
15
I would need to adjust the priorities
16
of these building materials.
17
And one way to do that,
18
is to select the two elements
19
that you want to make the adjustment to,
20
and then use your Alt or Option command and select it,
21
and then go up to options.
22
And then we're going to go to is building materials.
23
We did talk about this earlier,
24
but this will help you understand
25
a little bit more about why the priorities
26
within the building materials is important.
27
So I'm going to do two things, I'm going to select priorities,
28
and now it's sorting the priorities of all the elements
29
from least important to most important.
30
And so I'm going to click this button,
31
which will gather the things I've already selected
32
within the two elements,
33
the wall and slab that have already worked with.
34
So one thing I want to do is,
35
maybe I want to adjust where that gypsum board
36
is interacting with the floor there.
37
And maybe I want the floor to go to the wall
38
and the gyp to stop at the top of the wood floor.
39
And I have the wood flooring here,
40
and then I have the gyp board here.
41
And you can see here,
42
so the gyp board has a priority setting of 300.
43
And the wood floor here has a priority set of 250.
44
And whether or not that's actually how we want to do it,
45
let's just alter this so that it's inverted.
46
And I just want to warn you that,
47
when you make a change like this, it is a global change,
48
it will affect every single place that this occurs.
49
So one thing that you might want to do,
50
is if you see two things
51
that you want to make an adjustment to,
52
it might be a good idea just to create a new one
53
and duplicate it.
54
But for now, we're just going to make a change
55
even though we know that it could have drastic effects
56
on everything from details to how things interact.
57
But I just want to warn you that that is a possibility,
58
but we're going to change it anyway.
59
So I'm going to put this at 300,
60
I'm going to put this at 250.
61
And so when I change it, just push enter,
62
and you can see right there
63
that those two things now interact in a different way.
64
So what I'm going to do,
65
is I'm clicking on this wall,
66
and I'm going to drop this wall below the slab,
67
and I'm going to show you what happens
68
because of the priorities.
69
So I have a wood wall, the framed wall here
70
and I have the concrete slab that represents the foundation.
71
And so all I'm doing is using the elevate tool
72
or adjusting the base,
73
and I clicked on the node at the end.
74
If I click on this edge here to kind of define
75
that that's where I want the bottom of the wall,
76
and I click, now we can see that that wall
77
is going past the concrete.
78
And that isn't how we want those two elements to interact.
79
And in pretty much no instance would we want that.
80
And so this is just a generic 10 inch floor.
81
So let's look at these again.
82
So I'm going to select these, highlight them,
83
push your Alt command and go to building materials.
84
So actually, what's occurring here is,
85
that's not a concrete floor,
86
that is actually a wood floor
87
and the wood floor
88
and this wood structural wall
89
are at different priorities,
90
and the wood floor is significantly less priority.
91
And, you know, in reality, that might make sense,
92
especially if you're doing a two storey structure,
93
you would want that to occur.
94
So let's just make that adjustment.
95
And we'll just have a good idea
96
of how powerful these priorities are
97
and how much you need to pay attention to them.
98
So we have the word structural at 647
99
and I'm going to go to the wood flooring
100
and I'm going to make it 648.
101
So it's just one priority stronger than the wood floor.
102
And let's see what happens.
103
So I'm just pushing Enter.
104
And you can see what happens there,
105
is now that wood floor and the wood flooring itself,
106
as well as the structure is going through that wall.
107
So let's just change it back.
108
So go back to building material,
109
so I have to use the Alt and select it.
110
And I'm going to go to building materials,
111
and so I'm going to put that structural,
112
I'm going to put that back to,
113
I believe it was 300 and push enter.
114
And then I'm just going to bring this back up.
115
So I'm clicking on this node along that blue line,
116
and I bring it back to the top of that slab
117
or that wood structure.
118
And there you have it.
119
That is building materials in a little bit more depth.
Can't find what you're looking for?
Get subtitles in any language from opensubtitles.com, and translate them here.