Do you know where the longest tunnel in
2
00:00:02,000 --> 00:00:05,000
the world is?The 5000 meter high Alps is
3
00:00:05,000 --> 00:00:06,960
a natural barrier for Italy to the Nordic
4
00:00:06,960 --> 00:00:08,640
region since 1980.
5
00:00:09,353 --> 00:00:11,433
The traffic volume here has grown rapidly
6
00:00:11,673 --> 00:00:13,513
and the existing roads and railways have
7
00:00:13,513 --> 00:00:15,473
reached their limits and are often closed
8
00:00:15,473 --> 00:00:16,393
due to bad weather.
9
00:00:17,170 --> 00:00:18,690
In order to strengthen the connection
10
00:00:18,690 --> 00:00:20,770
between the Nordic countries, engineers
11
00:00:20,770 --> 00:00:22,810
decided to build a new tunnel across the
12
00:00:22,810 --> 00:00:25,490
Alps. This is the St. Gothard Base Tunnel
13
00:00:25,490 --> 00:00:27,730
in Switzerland, which cost nearly 70
14
00:00:27,730 --> 00:00:29,970
billion and took 17 years to build.
15
00:00:30,394 --> 00:00:33,114
It is 57 kilometers long, and its deepest
16
00:00:33,114 --> 00:00:35,994
point is more than 2,440 meters
17
00:00:35,994 --> 00:00:38,474
from the ground. It consists of two huge
18
00:00:38,474 --> 00:00:40,554
tunnels with a diameter of 8 meters,
19
00:00:40,794 --> 00:00:42,714
allowing trains to travel at a speed of
20
00:00:42,714 --> 00:00:45,434
250 km/h for 100 years.
21
00:00:48,258 --> 00:00:49,898
To understand the rock conditions around
22
00:00:49,898 --> 00:00:51,778
the tunnel, they first dug a smaller
23
00:00:51,778 --> 00:00:54,018
exploratory tunnel and then used a 20
24
00:00:54,018 --> 00:00:55,818
million euro rock shield machine to
25
00:00:55,818 --> 00:00:57,898
complete the tunnel excavation. At the
26
00:00:57,898 --> 00:01:00,018
same time, another group of workers will
27
00:01:00,018 --> 00:01:02,258
use explosives to blast and dig cross
28
00:01:02,258 --> 00:01:04,018
tunnels and emergency shelters.
29
00:01:05,162 --> 00:01:07,242
Although this segmented excavation method
30
00:01:07,242 --> 00:01:08,762
can shorten the construction time by
31
00:01:08,762 --> 00:01:11,162
half, engineers must ensure that the
32
00:01:11,162 --> 00:01:12,842
tunnels can be accurately connected.
33
00:01:13,245 --> 00:01:14,605
When building a straight Rd. on the
34
00:01:14,605 --> 00:01:16,565
ground, there will be obstacles such as
35
00:01:16,565 --> 00:01:19,005
trees, hills and buildings, which can be
36
00:01:19,005 --> 00:01:21,285
easily solved by relying on navigation or
37
00:01:21,285 --> 00:01:22,005
high towers.
38
00:01:22,689 --> 00:01:24,529
But underground, even the slightest
39
00:01:24,529 --> 00:01:26,089
misjudgment can have catastrophic
40
00:01:26,089 --> 00:01:28,769
consequences, so engineers can only use
41
00:01:28,769 --> 00:01:31,329
GPS to mark the entire tunnel line first.
42
00:01:32,438 --> 00:01:34,278
But since there is no satellite signal
43
00:01:34,278 --> 00:01:36,358
underground, each shield machine will
44
00:01:36,358 --> 00:01:38,278
rely on a laser guidance system to
45
00:01:38,278 --> 00:01:39,398
maintain its course.
46
00:01:42,310 --> 00:01:44,550
Engineers will install a laser theodolite
47
00:01:44,550 --> 00:01:46,590
on the tunnel wall and use the principle
48
00:01:46,590 --> 00:01:48,510
of rectilinear propagation of light to
49
00:01:48,510 --> 00:01:50,070
guide the shield machine to dig in a
50
00:01:50,070 --> 00:01:51,670
straight line to ensure that the tunnel
51
00:01:51,670 --> 00:01:53,030
direction does not deviate.
52
00:01:53,494 --> 00:01:55,734
Because the shield machine is too large,
53
00:01:55,974 --> 00:01:57,894
in order to facilitate transportation
54
00:01:57,894 --> 00:01:59,734
from Germany to the construction site,
55
00:02:00,054 --> 00:02:02,374
engineers disassembled it into sections
56
00:02:02,374 --> 00:02:04,694
and transported it to the dock. Then
57
00:02:04,694 --> 00:02:06,454
hundreds of heavy trucks were used to
58
00:02:06,454 --> 00:02:08,614
cross mountains and narrow roads to
59
00:02:08,614 --> 00:02:10,654
deliver hundreds of thousands of parts to
60
00:02:10,654 --> 00:02:11,894
the entrance of the tunnel.
61
00:02:13,082 --> 00:02:15,162
In the next four months, the shield
62
00:02:15,162 --> 00:02:17,162
machine will be reassembled here.
63
00:02:18,769 --> 00:02:20,929
Although this tunnel is only 57
64
00:02:20,929 --> 00:02:23,489
kilometers long, it took 17 years to
65
00:02:23,489 --> 00:02:23,889
build.
66
00:02:24,361 --> 00:02:26,601
Every day, this shield machine can dig
67
00:02:26,601 --> 00:02:28,841
forward 20 meters, but when it encounters
68
00:02:28,841 --> 00:02:31,081
squeezing rock layers, it must stop.
69
00:02:31,537 --> 00:02:34,177
It took a total of 17 years to build this
70
00:02:34,177 --> 00:02:34,577
tunnel.
71
00:02:34,961 --> 00:02:36,961
When many workers first built the tunnel,
72
00:02:37,201 --> 00:02:39,041
their children were still in elementary
73
00:02:39,041 --> 00:02:39,441
school.
74
00:02:39,889 --> 00:02:41,649
After the construction was completed,
75
00:02:41,809 --> 00:02:44,129
their grandchildren were born. In order
76
00:02:44,129 --> 00:02:45,809
to build this tunnel, the engineering
77
00:02:45,809 --> 00:02:47,969
team used 4 million tons of concrete,
78
00:02:48,209 --> 00:02:49,929
which is equivalent to 40 times the
79
00:02:49,929 --> 00:02:51,609
world's tallest building, the Burj
80
00:02:51,609 --> 00:02:54,449
Khalifa. They excavate about 2,000 tons
81
00:02:54,449 --> 00:02:56,689
of rubble every day, and then transport
82
00:02:56,689 --> 00:02:58,209
it to the outside of the tunnel through a
83
00:02:58,209 --> 00:03:00,489
conveyor belt. The factory here will
84
00:03:00,489 --> 00:03:02,529
recycle the rubble and process it into
85
00:03:02,529 --> 00:03:05,089
concrete ring segments. Not keeping up
86
00:03:05,089 --> 00:03:06,689
with the progress of the shield machine,
87
00:03:06,929 --> 00:03:08,569
The segments will be transported to the
88
00:03:08,569 --> 00:03:10,929
depths of the tunnel 24 hours a day.
89
00:03:11,249 --> 00:03:13,569
Workers use mechanical arms to install
90
00:03:13,569 --> 00:03:15,529
the 4-ton concrete segments to the
91
00:03:15,529 --> 00:03:18,009
appropriate position. These segments are
92
00:03:18,009 --> 00:03:19,729
of different sizes and different
93
00:03:19,729 --> 00:03:22,289
interfaces. Each piece contains two
94
00:03:22,289 --> 00:03:24,529
layers of thick waterproof membranes.
95
00:03:24,849 --> 00:03:26,969
Workers must assemble them carefully to
96
00:03:26,969 --> 00:03:29,409
ensure the integrity of the tunnel. As
97
00:03:29,409 --> 00:03:31,649
the shield machine moves forward, workers
98
00:03:31,649 --> 00:03:33,489
pour concrete on the outer layer of the
99
00:03:33,489 --> 00:03:35,409
segments to enhance the tunnel strength.
100
00:03:35,889 --> 00:03:37,649
The inner wall of the tunnel was also
101
00:03:37,649 --> 00:03:39,689
formed synchronously and the workers
102
00:03:39,689 --> 00:03:41,649
behind installed the track and signal
103
00:03:41,649 --> 00:03:42,929
system at the same time.
104
00:03:43,417 --> 00:03:45,097
But when the shield machine encountered
105
00:03:45,097 --> 00:03:47,337
softer squeezed rock, the workers had to
106
00:03:47,337 --> 00:03:49,137
use the initial drilling and blasting
107
00:03:49,137 --> 00:03:49,577
method.
108
00:03:49,969 --> 00:03:51,409
In order to speed up the progress of the
109
00:03:51,409 --> 00:03:53,969
project, they used an advanced 3D rock
110
00:03:53,969 --> 00:03:55,729
drilling trolley, which sprayed water
111
00:03:55,729 --> 00:03:57,409
while the drill bit rotated to cool the
112
00:03:57,409 --> 00:03:59,409
constantly heated drill bit and improve
113
00:03:59,409 --> 00:04:00,929
the working environment of the workers.
114
00:04:01,875 --> 00:04:03,635
In order to break the rock into small
115
00:04:03,635 --> 00:04:05,475
pieces that can be cleaned, each
116
00:04:05,475 --> 00:04:07,355
explosive will explode with the next
117
00:04:07,355 --> 00:04:09,235
explosive for a millisecond of rock.
118
00:04:19,275 --> 00:04:21,075
After the blasting is completed, the
119
00:04:21,075 --> 00:04:23,155
surface of the rock wall is uneven and
120
00:04:23,155 --> 00:04:24,555
the workers will spray a layer of
121
00:04:24,555 --> 00:04:26,395
concrete on the surface and support it
122
00:04:26,395 --> 00:04:27,915
with concentric ring brackets.
123
00:04:28,657 --> 00:04:30,257
This bracket is different from the
124
00:04:30,257 --> 00:04:32,937
traditional rigid arch frame. It can move
125
00:04:32,937 --> 00:04:34,777
within a certain range and resist the
126
00:04:34,777 --> 00:04:36,257
pressure of mountain squeezing.
127
00:04:36,721 --> 00:04:38,481
Although building this tunnel was a very
128
00:04:38,481 --> 00:04:40,281
challenging project, the workers
129
00:04:40,281 --> 00:04:42,161
persisted and finally successfully
130
00:04:42,161 --> 00:04:44,801
completed the task. So, what kind of
131
00:04:44,801 --> 00:04:47,241
tunnel is safe?The train is running in
132
00:04:47,241 --> 00:04:49,441
the tunnel and the view is not wide.
133
00:04:49,897 --> 00:04:51,257
In order to ensure the safety of
134
00:04:51,257 --> 00:04:53,257
passengers, the engineers of the Saint
135
00:04:53,257 --> 00:04:55,337
Gotthard Base Tunnel designed 2 one way
136
00:04:55,337 --> 00:04:57,257
tracks which completely prevented the
137
00:04:57,257 --> 00:04:59,257
collision of two trains, but they still
138
00:04:59,257 --> 00:05:00,537
faced the threat of fire.
139
00:05:00,937 --> 00:05:03,817
In 1999, a serious fire accident
140
00:05:03,817 --> 00:05:05,977
occurred in the 11 kilometer Mont Blanc
141
00:05:05,977 --> 00:05:06,617
Road Tunnel.
142
00:05:07,161 --> 00:05:09,001
A truck suddenly caught fire in the
143
00:05:09,001 --> 00:05:11,361
center of the tunnel. The fire quickly
144
00:05:11,361 --> 00:05:14,201
engulfed more than 30 cars around it. The
145
00:05:14,201 --> 00:05:15,881
tunnel was filled with a lot of smoke,
146
00:05:16,121 --> 00:05:17,881
and the surrounding temperature instantly
147
00:05:17,881 --> 00:05:19,961
soared to more than 1000 degrees.
148
00:05:20,635 --> 00:05:22,875
It took more than 50 firefighters 3 days
149
00:05:22,875 --> 00:05:25,115
to put it out, and the fire killed 39
150
00:05:25,115 --> 00:05:27,355
people, most of whom died from inhaling
151
00:05:27,355 --> 00:05:29,995
toxic fumes. The Gotthard Base Tunnel is
152
00:05:29,995 --> 00:05:32,715
57 kilometers long, and the consequences
153
00:05:32,715 --> 00:05:34,955
would be disastrous if a fire broke out.
154
00:05:35,347 --> 00:05:37,427
Therefore, engineers built three
155
00:05:37,427 --> 00:05:39,587
emergency shelters inside the tunnel.
156
00:05:39,907 --> 00:05:42,627
Passengers can enter the 470 meter long
157
00:05:42,627 --> 00:05:44,907
central shelter through fire doors, where
158
00:05:44,907 --> 00:05:46,867
they can wait for rescuers, who will use
159
00:05:46,867 --> 00:05:48,147
another tunnel to get there.
160
00:05:48,547 --> 00:05:50,547
To prevent toxic gases from entering the
161
00:05:50,547 --> 00:05:52,467
shelter, the ventilation system will be
162
00:05:52,467 --> 00:05:54,707
remotely activated and powerful fans
163
00:05:54,707 --> 00:05:56,787
above the track will suck in toxic fumes
164
00:05:56,787 --> 00:05:58,387
and exhaust them from the exhaust vents
165
00:05:58,387 --> 00:05:58,867
above.
166
00:05:59,821 --> 00:06:02,141
At the same time, imported fans will
167
00:06:02,141 --> 00:06:03,981
replenish clean air in the tunnel.
168
00:06:04,405 --> 00:06:06,325
This ingenious safety system adds
169
00:06:06,325 --> 00:06:09,205
38.5 million francs to each shelter.
170
00:06:09,661 --> 00:06:12,541
The total cost reached 95.6 billion
171
00:06:12,541 --> 00:06:14,421
Swiss francs, which is equivalent to
172
00:06:14,421 --> 00:06:16,781
about 68.1 billion yuan.
173
00:06:17,197 --> 00:06:19,037
According to official data, the tunnel
174
00:06:19,037 --> 00:06:20,677
only reduced the travel time between
175
00:06:20,677 --> 00:06:23,037
Milan and Zurich by 50 minutes, which is
176
00:06:23,037 --> 00:06:24,637
not much more efficient, but it can
177
00:06:24,637 --> 00:06:26,357
better withstand the changing climate and
178
00:06:26,357 --> 00:06:28,277
traffic of the mountains, making trade
179
00:06:28,277 --> 00:06:29,997
between European countries closer.
180
00:06:30,373 --> 00:06:32,893
In short, the Gotthard Base Tunnel is a
181
00:06:32,893 --> 00:06:35,173
testament to the ingenuity and skill of
182
00:06:35,173 --> 00:06:37,453
modern engineering. It is an incredible
183
00:06:37,453 --> 00:06:39,293
achievement that connects countries and
184
00:06:39,293 --> 00:06:41,053
enables faster and more efficient
185
00:06:41,053 --> 00:06:43,893
transportation. Who knows?Maybe one
186
00:06:43,893 --> 00:06:45,653
day you will have the opportunity to
187
00:06:45,653 --> 00:06:47,733
experience this impressive tunnel in
188
00:06:47,733 --> 00:06:48,213
person.
189
00:06:49,789 --> 00:06:51,869
Thanks for joining me on this tour of
190
00:06:51,869 --> 00:06:52,989
Gothard Base Tunnel.
191
00:06:54,763 --> 00:06:56,843
If you enjoyed this video, please like,
192
00:06:56,923 --> 00:06:59,323
subscribe, and hit that bell icon for
193
00:06:59,323 --> 00:07:02,203
more amazing content. See you next time!13670